FX74 Strategic Airlift Hangar, Naval Station Rota, Spain
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, specifically NAVFACSYSCOM ATLANTIC, is soliciting proposals for the construction of the FX74 Strategic Airlift Hangar at Naval Station Rota, Spain. This is a Solicitation for Construction Of Other Industrial Buildings (PSC: Y1EZ). The project involves significant technical specifications and environmental considerations, particularly regarding the common chameleon. Proposals are due by April 16, 2026, at 2:00 PM Norfolk, VA local time.
Scope of Work
The project entails the construction of a strategic airlift hangar, including its primary facility components such as the hangar structure, office/breakroom, fire suppression and alarm systems, telecommunications, supporting site work, parking, fencing, landscaping, and various utility systems (e.g., site fire protection water supply, lighting, drain detention, photovoltaic, EV charging). Option items include contaminated soils removal, unexpected large debris removal, Electronic Security Systems (ESS)/Intrusion Detection System (IDS)/CCTV, and Audio/Visual (A/V) Systems.
Contract Details & Timeline
- Opportunity Type: Solicitation
- Product Service Code: Y1EZ (Construction Of Other Industrial Buildings)
- Set-Aside: None specified
- Contract Completion Time: 1200 calendar days after notice to proceed; exercise of options will not extend this date.
- Proposal Due Date: April 16, 2026, 2:00 PM Norfolk, VA local time (as per Amendment 0005).
- Published Date: April 8, 2026.
Key Amendments & Changes
Multiple amendments have been issued, significantly impacting submission requirements and technical specifications:
- Amendment 0005 (Latest): Extended the proposal submission deadline to April 16, 2026.
- Amendment 0004: Provided responses to numerous Pre-Proposal Inquiries (PPIs 6, 7, 12-71), revised Attachments B (Price Schedule), J (Chameleon Survey), and K (Protected Species Protocol). Clarified that PPIs submitted after March 19, 2026, would not be responded to.
- Amendment 0002: Mandated the submission of a complete Price Proposal Form (Attachment B) and clarified contract completion timelines. Added new attachments, including redacted Justification & Approvals and Attachment G.
- Amendment 0001: Clarified the PPI submission deadline (superseded by Amendment 0004) and specified that alternative methods for Vertical Lift Fabric Doors not explicitly stated in the revised UFGS 08 34 16.20 will not be considered.
- PPI Continuation Sheet_FX74.pdf: Detailed extensive updates to specifications and drawings, including cybersecurity requirements for HVAC, Fire & Life Safety, and Electrical control systems, as well as revisions to foundation, grading, and door specifications.
Submission Requirements & Environmental Considerations
- Price Proposal: Bidders must use the revised Attachment B Price Schedule to provide detailed line item pricing for all components and option items.
- Spanish Registration: Offerors must certify their registration and classification status in the Official Register of Bidders and Contractors of the Spanish Ministry of Finance, or provide equivalent accreditation for EU member nations, as per Attachment G.
- Environmental Protocols: Bidders must adhere to the