FX74 Strategic Airlift Hangar, Naval Station Rota, Spain

SOL #: N6247026R0008Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM ATLANTIC
NORFOLK, VA, 23508-1278, United States

Place of Performance

Place of performance not available

NAICS

Industrial Building Construction (236210)

PSC

Construction Of Other Industrial Buildings (Y1EZ)

Set Aside

No set aside specified

Timeline

1
Posted
Dec 19, 2025
2
Last Updated
Apr 9, 2026
3
Submission Deadline
Apr 16, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy, NAVFACSYSCOM ATLANTIC, is soliciting proposals for the construction of the FX74 Strategic Airlift Hangar at Naval Station Rota, Spain. This opportunity involves constructing a new hangar facility, including associated infrastructure and environmental mitigation measures. Proposals are due April 16, 2026.

Scope of Work

The project encompasses the full construction of the FX74 Strategic Airlift Hangar, including primary facility components such as the hangar structure, office/breakroom areas, fire suppression and alarm systems, telecommunications infrastructure, and supporting site work. Site work includes parking lots, fencing, exterior shade structures, landscaping, site fire protection water supply, site lighting, drain detention systems, a photovoltaic system, and electric vehicle charging.

Significant environmental considerations are integrated into the project, particularly concerning the protection of the common chameleon population and its habitat, requiring pre-construction surveys, specialized relocation procedures, and specific construction practices. Landscaping and tree replacement (3:1 ratio for removed trees) must adhere to detailed guidelines and local authorizations.

Contract & Timeline

  • Type: Solicitation (Construction of Other Industrial Buildings - Y1EZ)
  • Duration: The contract completion time is 1200 calendar days from the Notice to Proceed, including any exercised options.
  • Set-Aside: None specified.
  • Proposal Due: April 16, 2026, at 2:00 PM Norfolk, VA local time.
  • Published: April 9, 2026.

Key Requirements & Amendments

Multiple amendments have been issued, clarifying technical specifications and extending deadlines. Key clarifications include:

  • Vertical Lift Fabric Doors: Specific paragraphs were intentionally omitted from UFGS 08 34 16.20; alternative methods will not be considered. Horizontal rolling steel doors are rejected in favor of the specified vertical lift fabric door system.
  • Environmental Compliance: Strict adherence to the Protected Species Protocol for the Common Chameleon, including a capture and translocation plan, and detailed landscaping guidelines (Attachment N) and tree list (Attachment M).
  • Spanish Regulations: Offerors and subcontractors must comply with Spanish law regarding registration and classification, as detailed in Attachment G.
  • Cybersecurity: Compliance with NIST SP 800-171 assessments is required for subcontractors.
  • Fire Protection: The project must comply with both US and Host Nation fire protection and commissioning criteria.
  • Pricing: Proposals must be submitted in U.S. Dollars. An offer guarantee and bid bond are not required.
  • Pre-Proposal Inquiries (PPIs): The government will not respond to PPIs submitted after February 11, 2026 (as per Amendment 0001) or March 19, 2026 (as per Amendment 0004).

Contact Information

For inquiries, contact Stacy Mitchell at stacy.l.harper-mitchell.civ@us.navy.mil or 757-322-4667.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
View
View
View
View

Versions

Version 11Viewing
Solicitation
Posted: Apr 9, 2026
Version 10
Solicitation
Posted: Apr 9, 2026
View
Version 9
Solicitation
Posted: Apr 8, 2026
View
Version 8
Solicitation
Posted: Apr 8, 2026
View
Version 7
Solicitation
Posted: Mar 13, 2026
View
Version 6
Solicitation
Posted: Mar 13, 2026
View
Version 5
Solicitation
Posted: Mar 9, 2026
View
Version 4
Solicitation
Posted: Feb 24, 2026
View
Version 3
Solicitation
Posted: Feb 6, 2026
View
Version 2
Solicitation
Posted: Dec 19, 2025
View
Version 1
Solicitation
Posted: Dec 19, 2025
View
FX74 Strategic Airlift Hangar, Naval Station Rota, Spain | GovScope