FX74 Strategic Airlift Hangar, Naval Station Rota, Spain
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVFACSYSCOM ATLANTIC, is soliciting proposals for the FX74 Strategic Airlift Hangar at Naval Station Rota, Spain. This opportunity involves the construction of an industrial building to support strategic airlift operations. Proposals are due April 16, 2026.
Scope of Work
This project entails the comprehensive construction of a strategic airlift hangar, including the hangar facility, office/breakroom areas, fire suppression and alarm systems, telecommunications infrastructure, and extensive site work. Site work encompasses parking lots, fencing, exterior shade structures, landscaping, fire protection water supply, site lighting, a drain detention system, a photovoltaic system, and electric vehicle charging. The project also includes various option items such as contaminated soils removal, unexpected large debris removal, Electronic Security Systems (ESS)/Intrusion Detection System (IDS)/Closed Circuit TV (CCTV), and Audio/Visual (A/V) Systems.
Key Requirements & Considerations
- Environmental Compliance: Strict adherence to the Protected Species Protocol for the Common Chameleon (Attachment K) is mandatory. This includes pre-construction surveys, specialized relocation procedures, specific construction practices, and post-construction restoration. A 3rd Party Archaeologist must be included in the proposal.
- Technical Specifications: Numerous revisions have been made to specifications and drawings. Bidders must carefully review updates to Vertical Lift Fabric Door specifications (UFGS 08 34 16.20), Fall Protection, Foundation Schedules, and Cybersecurity for HVAC, Fire/Life Safety, and Electrical control systems. Alternative methods for Vertical Lift Fabric Doors not explicitly stated in the revised specification will not be considered.
- Compliance & Eligibility:
- Offerors must use the most recent Price Proposal Form (Attachment B - REVISED); failure to do so will result in proposal ineligibility.
- Compliance with DFARS 252.204-7020 and Supplier Performance Risk System (SPRS) scores for both prime and subcontractors is required prior to contract award.
- Companies must certify their registration and classification status in accordance with Spanish law (Attachment G), either through the Official Register of Bidders and Contractors or by self-certifying for other EU member nations.
- Integrated Systems: The project requires integration of specific brand-name or sole-source components, including Telefónica for Outside Plant (OSP) telecommunications, Siemens Desigo for Building Control Systems (BCS), and Schneider Electric/AirMagnet/Firetide products for Advanced Metering Infrastructure (AMI).
Contract & Timeline
- Type: Solicitation (RFP) for construction.
- Product Service Code: Y1EZ (Construction Of Other Industrial Buildings).
- Set-Aside: None specified.
- Proposal Due: April 16, 2026, at 2:00 PM Norfolk, VA local time.
- Contract Completion: 1200 calendar days after Notice to Proceed; exercise of options will not extend this date.
- Contact: Stacy Mitchell, stacy.l.harper-mitchell.civ@us.navy.mil, 757-322-4667.