GAOA Lake Winfield Scott Campground (GA)

SOL #: 12445226Q0003Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA EAST 12
Atlanta, GA, 303092449, United States

Place of Performance

GA

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Recreational Buildings (Y1FB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 15, 2026
2
Last Updated
Mar 12, 2026
3
Submission Deadline
Feb 25, 2026, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service, CSA EAST 12, has issued a Solicitation (RFQ) for the GAOA Lake Winfield Scott Campground Construction – Phase 1 project in Suches, GA. This Total Small Business Set-Aside aims to replace obsolete and damaged infrastructure, including bathhouses, water, and sewer systems. The anticipated award is a Firm-Fixed-Price construction contract. Offers are due by February 25, 2026, at 5 PM EST.

Scope of Work

This project involves comprehensive reconstruction efforts at Lake Winfield Scott Campground. Base Scope:

  • Demolition and replacement of the existing north loop bathhouse, including new toilet building and drain field.
  • Repair and replacement of the campground water system (HDPE to PVC, spring boxes, valves).
  • Repair and replacement of campground sewer lines, manholes, pump station, and expansion of the central drain field.
  • Pavement repairs and resurfacing of minor road sections.
  • Implementation of soil erosion control and site stabilization.
  • Survey staking to establish benchmarks. Optional Scope (contingent on funding):
  • Replacement of the south loop bathhouse.
  • Repair/renovation of the guard shack.
  • Replacement of the entrance/dump station.

Contract Details & Timeline

  • Contract Type: Firm-Fixed-Price construction contract.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • Period of Performance: 12 months from the Notice to Proceed.
  • Site Visit: A site visit is scheduled for Wednesday, January 28, 2026, at 10 AM EST at 439 Lake Winfield Scott Rd, Suches, GA 30572. Bidders should plan for potential delays due to ongoing bridge construction on SR-180.
  • Questions Due: Formal questions/RFIs are due by Friday, January 30, 2026, at 1 PM EST via email to the primary contact.
  • Offers Due: Tuesday, February 25, 2026, at 5 PM EST.

Evaluation Criteria

Award will be based on a Best Value determination, considering:

  • Relevant Experience: Demonstrated experience as a General Contractor on similar projects ($2M+ value, completed within 8 years).
  • Past Performance: Five relevant contracts within the last five years for the offeror, teaming partners, and critical subcontractors.
  • Key Personnel: Resumes for Project Manager and On-Site Construction Superintendent meeting specific experience and education requirements.
  • Technical Approach: Narrative and GANTT chart schedule demonstrating understanding and capacity.
  • Price: Fair and reasonable pricing for all items, including options.

Submission Requirements

Required documents include a signed SF 1449, completed Schedule of Items (A3-SOI), acknowledgment of amendments, Bid Guarantee (SF 24), Technical Approach, and Past Performance Questionnaires (A6). Bidders must also comply with prevailing wage rates (Davis-Bacon Act) and ensure all necessary permits are obtained.

People

Points of Contact

Penny ZortmanPRIMARY
SIMS, JALISA CSECONDARY

Files

Files

No files attached to this opportunity

Versions

Version 11
Solicitation
Posted: Mar 12, 2026
View
Version 10
Solicitation
Posted: Mar 10, 2026
View
Version 9
Solicitation
Posted: Mar 7, 2026
View
Version 8
Solicitation
Posted: Mar 5, 2026
View
Version 7
Solicitation
Posted: Feb 13, 2026
View
Version 6
Solicitation
Posted: Feb 9, 2026
View
Version 5
Solicitation
Posted: Jan 30, 2026
View
Version 4
Solicitation
Posted: Jan 23, 2026
View
Version 3
Solicitation
Posted: Jan 23, 2026
View
Version 2
Solicitation
Posted: Jan 23, 2026
View
Version 1Viewing
Solicitation
Posted: Jan 15, 2026