GAOA Lake Winfield Scott Campground (GA)
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The USDA Forest Service is soliciting proposals for the GAOA Lake Winfield Scott Campground Reconstruction – Phase 1 project in Suches, Georgia. This Total Small Business Set-Aside opportunity seeks a contractor to replace obsolete infrastructure, including bathhouses, water and sewer systems, and perform pavement repairs. Quotes are due by February 25, 2026, at 10:00 PM ET.
Project Scope
This project focuses on Phase 1 reconstruction at Lake Winfield Scott Campground. Key tasks include:
- North Loop Bathhouse: Demolition of the existing structure, installation of a new toilet building, and a new drain field.
- Water System: Repair and replacement of the campground water system, including upgrading HDPE pipe to PVC, replacing concrete spring boxes and manhole risers, and installing new water valves.
- Sewer System: Repair or replacement of campground sewer lines, manholes, and pump station, alongside expansion of the existing central drain field.
- Infrastructure: Pavement repairs and resurfacing of minor road sections, soil erosion control, site stabilization, and survey staking.
- Optional Tasks: Contingent on funding, these include replacing the south loop bathhouse, repairing/renovating the guard shack, and replacing the entrance/dump station.
Contract Details & Timeline
- Contract Type: Firm-fixed-price construction contract.
- Set-Aside: Total Small Business Set-Aside (FAR 19.5).
- Period of Performance: 12 months from the date of Notice to Proceed.
- Place of Performance: Lake Winfield Scott Campground, Blue Ridge Ranger District, Chattahoochee-Oconee National Forests, Suches, GA.
- Quote Due Date: February 25, 2026, 10:00 PM ET.
- Questions Due Date: Extended; bidders should monitor for new details via solicitation amendment.
- Site Visit: The scheduled site visit for January 28, 2026, has been postponed. Bidders should monitor for new site visit details. A non-mandatory pre-bid site visit can be scheduled upon request.
- Published Date: January 23, 2026.
Submission & Evaluation
Award will be based on a Best Value approach, considering:
- Relevant Experience: Demonstrated experience as a General Contractor on similar projects ($2M+ value, completed within 8 years).
- Past Performance: Five relevant contracts within the last five years for the offeror, teaming partners, and critical subcontractors.
- Key Personnel: Resumes for Project Manager and On-Site Construction Superintendent meeting specific experience and education requirements.
- Technical Approach: A narrative and GANTT chart schedule demonstrating understanding and capacity.
- Price: Fair and reasonable pricing for all items, including options.
Required documents include a signed SF 1449, completed Schedule of Items (A3-SOI), acknowledgement of amendments, Bid Guarantee (SF 24), Technical Approach, and Past Performance Questionnaires (A6).
Important Notes
- The project requires compliance with all applicable FAR and AGAR clauses, including specific clauses for commercial construction and DEI.
- Prevailing wage rates (General Decision Number GA20250107) apply for building construction in Fannin, Franklin, Gilmer, Union, and White Counties, GA.
- Bidders should be aware of ongoing bridge construction on SR-180 at Slaughter Creek, which may impact logistics and timelines for site access. The roadway is reduced to a single lane with automated traffic signals.
- The campground will be closed to the public during construction operations.
Contact Information
- Primary: Penny Zortman (penny.Zortman@usda.gov)
- Secondary: Jalisa C. Sims (jalisa.sims@usda.gov, 346-579-4178)