GAOA Lake Winfield Scott Campground (GA)

SOL #: 12445226Q0003Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA EAST 12
Atlanta, GA, 303092449, United States

Place of Performance

GA

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Recreational Buildings (Y1FB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 15, 2026
2
Last Updated
Mar 12, 2026
3
Submission Deadline
Mar 23, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service is soliciting Requests for Quotation (RFQ) for the GAOA Lake Winfield Scott Campground Construction project in Suches, GA. This project involves replacing obsolete infrastructure, including bathhouses, water/sewer systems, and performing site stabilization and pavement repairs. This is a Total Small Business Set-Aside with an estimated magnitude between $1,000,000 and $5,000,000. Quotes are due by March 23, 2026, at 5:00 PM EST.

Scope of Work

The project, Phase 1 of the Lake Winfield Scott Campground Reconstruction, aims to replace infrastructure beyond its usable life. The Base Bid Scope includes: replacement of the existing north loop bathhouse (including demolition, new building, and drain field), updating the campground water system, repair or replacement of campground sewer lines, construction of a 0.15-mile service road, minor pavement repairs, soil erosion control/site stabilization, and survey staking. Optional Bid Items (contingent on funding) include: demolition of two existing south loop bathhouses and construction of a new centralized bathhouse, demolition of the existing entrance station and construction of a new one, and installation of a new RV dump station. The campground will be closed to the public during the 12-month performance period.

Contract Details

  • Contract Type: Request for Quotation (RFQ) for commercial construction items.
  • Set-Aside: Total Small Business Set-Aside.
  • NAICS: 236220 - Commercial and Institutional Building Construction ($45M size standard).
  • Magnitude: Between $1,000,000 and $5,000,000.
  • Period of Performance: 365 calendar days (12 months) after Notice to Proceed.
  • Bonds: Bid Guarantee (SF 24), Performance, and Payment Bonds are required.
  • Wage Rates: Davis-Bacon Act applies, with prevailing wage rates specified for Union County, GA.

Submission & Evaluation

  • Quote Due Date: March 23, 2026, by 5:00 PM EST.
  • Submission: Quotes must be submitted as separate Technical and Price volumes via email to penny.zortman@usda.gov and jalisa.sims@usda.gov.
  • Evaluation Criteria: Best value to the Government, considering:
    • Technical Proposal: Technical Approach, Relevant Experience (three similar projects, $2M+ each, completed within 8 years as General Contractor), and Key Personnel (Project Manager, On-Site Superintendent).
    • Past Performance: Five relevant contracts within the last five years for the offeror and critical subcontractors (CPARS acceptable, Past Performance Questionnaires not).
    • Price: Fair and reasonable pricing based on the Schedule of Items (A3-SOI).
  • Site Visit: A site visit was held on February 11, 2026.
  • Questions: The deadline for questions was February 17, 2026.

Important Notes

Offerors must hold prices firm for 90 calendar days. Bridge construction on SR-180 at Slaughter Creek may impact logistics to the site.

People

Points of Contact

Penny ZortmanPRIMARY
SIMS, JALISA CSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 11
Solicitation
Posted: Mar 12, 2026
View
Version 10
Solicitation
Posted: Mar 10, 2026
View
Version 9Viewing
Solicitation
Posted: Mar 7, 2026
Version 8
Solicitation
Posted: Mar 5, 2026
View
Version 7
Solicitation
Posted: Feb 13, 2026
View
Version 6
Solicitation
Posted: Feb 9, 2026
View
Version 5
Solicitation
Posted: Jan 30, 2026
View
Version 4
Solicitation
Posted: Jan 23, 2026
View
Version 3
Solicitation
Posted: Jan 23, 2026
View
Version 2
Solicitation
Posted: Jan 23, 2026
View
Version 1
Solicitation
Posted: Jan 15, 2026
View
GAOA Lake Winfield Scott Campground (GA) | GovScope