GAOA Lake Winfield Scott Campground (GA)
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The USDA Forest Service is soliciting proposals for the GAOA Lake Winfield Scott Campground Construction project, located at the Blue Ridge Ranger District, Chattahoochee-Oconee National Forests in Suches, GA. This Total Small Business Set-Aside opportunity involves replacing obsolete and damaged infrastructure. The original site visit scheduled for January 28, 2026, has been cancelled and will be rescheduled. Similarly, the deadline for questions and quotes will be extended via amendment. The current response date for quotes is February 25, 2026.
Scope of Work
This Phase 1 project aims to prevent increasing deferred maintenance costs by replacing existing infrastructure. Primary tasks include:
- Replacing the north loop bathhouse, including demolition, new toilet building, and drain field.
- Repairing and replacing the campground water system (pipes, spring boxes, manhole risers, valves).
- Repairing or replacing campground sewer lines, manholes, and pump station, and expanding the central drain field.
- Performing pavement repairs and resurfacing minor road sections.
- Implementing soil erosion control and site stabilization.
- Conducting survey staking. Optional tasks (contingent on funding) include:
- Replacing the south loop bathhouse.
- Repairing/renovating the guard shack.
- Replacing the entrance/dump station.
Contract Details
- Contract Type: Firm-fixed-price construction contract.
- Set-Aside: Total Small Business Set-Aside (FAR 19.5).
- Period of Performance: 12 months from the Notice to Proceed.
- Place of Performance: Lake Winfield Scott Campground, Suches, GA 30572.
- Operational Hours: Work is permitted Monday through Friday, 6 a.m. to 6 p.m. EST, excluding Federal holidays, unless approved otherwise.
- Permits: Forest Service has initial permits; contractor is responsible for acquiring all other applicable permits.
- Prevailing Wages: Bidders must adhere to prevailing wage rates for building construction in Union County, GA, as specified in document A9 (GA20250107).
Key Requirements & Evaluation
Award will be based on Best Value to the Government, considering:
- Relevant Experience: Demonstrated experience as a General Contractor on similar projects ($2M+ value, completed within 8 years).
- Past Performance: Five relevant contracts within the last five years for the offeror, teaming partners, and critical subcontractors, assessed via Past Performance Questionnaires (A6).
- Key Personnel: Resumes for Project Manager and On-Site Construction Superintendent meeting specific experience and education requirements.
- Technical Approach: Narrative and GANTT chart schedule demonstrating understanding and capacity.
- Price: Fair and reasonable pricing for all items, including options, as detailed in the Schedule of Items (A3-SOI). Required Documents: Signed SF 1449, completed Schedule of Items (A3-SOI), acknowledgement of amendments, Bid Guarantee (SF 24), Technical Approach, and Past Performance Questionnaires (A6).
Important Dates & Site Visit
- Published Date: January 23, 2026.
- Site Visit: The site visit scheduled for January 28, 2026, is cancelled and will be rescheduled. Monitor the description section for updates.
- Questions Deadline: The deadline for questions (originally January 30, 2026, 1:00 PM ET) will be extended via amendment.
- Quote Response Date: February 25, 2026 (Note: This deadline will also be extended via amendment per the description).
Additional Information
Bidders should be aware of ongoing bridge construction on SR-180 at Slaughter Creek, which may impact logistics and timelines, with a GDOT project completion date of December 31, 2026. Detailed architectural drawings (A5), a comprehensive Statement of Work (A2), and project specifications (A4) are available.