Kennel Building Construction

SOL #: 12639526Q0088Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Animal And Plant Health Inspection Service
MRPBS MINNEAPOLIS MN
MINNEAPOLIS, MN, 55401, United States

Place of Performance

Millville, UT

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Miscellaneous Buildings (Y1JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 30, 2026
2
Last Updated
May 8, 2026
3
Submission Deadline
Apr 29, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA-APHIS-Wildlife Services is soliciting proposals for the construction of a new kennel building for its Predator Research Facility in Millville, UT. This is a Total Small Business Set-Aside opportunity, issued as a Combined Synopsis/Solicitation (RFQ). The project involves building a pre-engineered metal structure of approximately 3,400 square feet. Quotes are due by April 29, 2026, at 11 a.m. MT.

Scope of Work

The requirement is for the construction of a new pre-engineered metal kennel building, approximately 3,400 square feet, designed by Cushing Terrell. The structure will comprise four distinct sections: kennel areas A and B, a mud room, and a mechanical room. This facility supports the Predator Research Facility's mission to generate ecological information for carnivore management. Detailed specifications are provided in the "Kennel Project Manual" (Attachment 3) covering divisions 00-33, and comprehensive "100% Construction Documents" (Attachment 4) including architectural, civil, structural, mechanical, plumbing, and electrical drawings.

Contract Details

  • Contract Type: Request for Quotations (RFQ) leading to a construction contract awarded on Standard Form 1442.
  • Estimated Magnitude: Between $1,000,000 and $5,000,000.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • Place of Performance: Millville, Cache County, UT 84326.
  • Period of Performance: Work must commence within 10 calendar days after Notice to Proceed (NTP) and be completed within 365 days after NTP.
  • Wage Rates: Bidders must comply with Federal Construction Wage Rates for Cache County, UT (General Decision Number UT20260082), as detailed in Attachment 2.

Submission & Evaluation

  • Quotes Due: April 29, 2026, 11 a.m. MT.
  • Submission Method: Email complete quote package to james.g.roloff@usda.gov.
  • Quote Package Requirements: RFQ page, detailed pricing breakdown, demonstration of relevant experience, and past performance information.
  • Evaluation Criteria: Award will be made to the highest technically rated offeror with a fair and reasonable price. No tradeoffs between price and non-price factors will be considered.
  • Evaluation Factors: Price, Technical Capability (relevant experience with pre-engineered metal buildings, technical approach including work sequencing, critical activities, project management, quality control, and safety), and Past Performance.

Key Dates & Contact

  • Published Date: April 8, 2026.
  • Site Visit: April 15, 2026, at 10 a.m. MT at the project location.
  • Questions Due: April 24, 2026, at 12 p.m. CT.
  • Primary Point of Contact: Jim Roloff (james.g.roloff@usda.gov, 612-590-7603).

Additional Notes

The solicitation incorporates various FAR and AGAR clauses by reference. USDA is exempt from sales tax. An Ombudsman Program for Agency Protests (OPAP) is available.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download

Versions

Version 9
Combined Synopsis/Solicitation
Posted: May 8, 2026
View
Version 8
Combined Synopsis/Solicitation
Posted: Apr 29, 2026
View
Version 7
Combined Synopsis/Solicitation
Posted: Apr 24, 2026
View
Version 6
Combined Synopsis/Solicitation
Posted: Apr 23, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: Apr 17, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Apr 17, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Apr 9, 2026
View
Version 2Viewing
Combined Synopsis/Solicitation
Posted: Apr 8, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Mar 30, 2026
View