Kennel Building Construction

SOL #: 12639526Q0088Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Animal And Plant Health Inspection Service
MRPBS MINNEAPOLIS MN
MINNEAPOLIS, MN, 55401, United States

Place of Performance

Millville, UT

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Miscellaneous Buildings (Y1JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 30, 2026
2
Last Updated
May 8, 2026
3
Submission Deadline
Apr 29, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA-APHIS-Wildlife Services is soliciting quotes for the construction of a new Kennel Building in Millville, UT. This project involves a pre-engineered metal building of approximately 3,400 sq ft, designed to support the Predator Research Facility's mission. This opportunity is a Total Small Business Set-Aside. Quotes are due by April 29, 2026, at 11 a.m. MT.

Purpose & Scope

The requirement is for the construction of a new kennel building, designed by Cushing Terrell, which will include four sections: kennel areas A & B, a mud room, and a mechanical room. The facility supports the Predator Research Facility's mission to generate and disseminate ecological information related to carnivore management. Key clarifications from RFIs indicate the roof metal panel is PBU and both roof and soffit panels are 24 gauge.

Key Requirements

  • Construct a new pre-engineered metal kennel building, approximately 3,400 sq ft.
  • Adhere strictly to the final design documents, including the comprehensive Project Manual (Attachment 3) and detailed Kennel Drawings (Attachment 4).
  • Comply with Federal Construction Wage Rates for Cache County, UT (Attachment 2), including Executive Orders on Paid Sick Leave and Minimum Wage for Federal Contractors.
  • Work must commence within 10 calendar days after Notice to Proceed (NTP) and be completed within 365 days after NTP.
  • The Geotechnical Study Report provides critical information for foundation, earthwork, and pavement design, noting Site Class D and very low liquefaction potential.

Contract Details

  • Opportunity Type: Combined Synopsis/Solicitation (Request for Quotations).
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • Product/Service Code: Y1JZ - Construction Of Miscellaneous Buildings.
  • Estimated Magnitude: Between $1,000,000 and $5,000,000.
  • Place of Performance: Millville, UT 84326.
  • Award: Will be made on Standard Form 1442.

Submission & Evaluation

  • Quotes Due: April 29, 2026, 11 a.m. MT.
  • Submission Method: Email complete quote package to james.g.roloff@usda.gov.
  • Quote Package: Must include the RFQ page, a detailed pricing breakdown, demonstration of relevant experience, and past performance information.
  • Evaluation Criteria: Quotes will be evaluated based on the highest technically rated with a fair and reasonable price. No tradeoffs between price and non-price factors will be considered.
  • Evaluation Factors: Price, Technical Capability (relevant experience with pre-engineered metal buildings, technical approach including work sequencing, critical activities, project management, quality control, and safety), and Past Performance.
  • Questions Due: April 24, 2026, 12 p.m. CT, submitted to james.g.roloff@usda.gov.

Important Dates & Contacts

  • Site Visit: April 15, 2026, 10 a.m. MT at the project location.
  • Primary Contact: Jim Roloff, james.g.roloff@usda.gov, 612-590-7603.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 9
Combined Synopsis/Solicitation
Posted: May 8, 2026
View
Version 8
Combined Synopsis/Solicitation
Posted: Apr 29, 2026
View
Version 7
Combined Synopsis/Solicitation
Posted: Apr 24, 2026
View
Version 6
Combined Synopsis/Solicitation
Posted: Apr 23, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: Apr 17, 2026
View
Version 4Viewing
Combined Synopsis/Solicitation
Posted: Apr 17, 2026
Version 3
Combined Synopsis/Solicitation
Posted: Apr 9, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Apr 8, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Mar 30, 2026
View