Kennel Building Construction

SOL #: 12639526Q0088Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Animal And Plant Health Inspection Service
MRPBS MINNEAPOLIS MN
MINNEAPOLIS, MN, 55401, United States

Place of Performance

Millville, UT

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Miscellaneous Buildings (Y1JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 30, 2026
2
Last Updated
May 8, 2026
3
Submission Deadline
Apr 29, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA-APHIS-Wildlife Services is soliciting quotes for the construction of a new kennel building in Millville, UT. This opportunity is a Total Small Business Set-Aside and seeks a pre-engineered metal building of approximately 3,400 SF. Quotes are due by April 29, 2026, at 11 a.m. MT.

Scope of Work

The project involves constructing a new pre-engineered metal kennel building, approximately 3,400 square feet, based on final design documents by Cushing Terrell. The structure will include four sections: kennel areas A & B, a mud room, and a mechanical room. This facility supports the Predator Research Facility's mission to generate ecological information for carnivore management. Work is expected to commence within 10 calendar days after Notice to Proceed (NTP) and be completed within 365 days after NTP.

Contract & Timeline

  • Contract Type: Combined Synopsis/Solicitation (Request for Quotations - RFQ)
  • Estimated Magnitude: Between $1M and $5M
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Quote Submission Deadline: April 29, 2026, 11 a.m. MT
  • Questions Deadline: April 24, 2026, 12 p.m. CT
  • Published Date: April 23, 2026

Submission & Evaluation

Quotes must be submitted to james.g.roloff@usda.gov and include the RFQ page, a detailed pricing breakdown, demonstration of relevant experience, and past performance information. Evaluation will be based on the highest technically rated with a fair and reasonable price, with no tradeoffs between price and non-price factors. Evaluation factors include Price, Technical Capability (experience with pre-engineered metal buildings, technical approach, work sequencing, project management, quality control, and safety), and Past Performance.

Key Documents & Notes

  • Amendment 1 updated the set-aside from SDVOSB to Total Small Business.
  • Construction Documents: Detailed architectural, civil, structural, mechanical, plumbing, and electrical drawings (Attachment 4) and a comprehensive Project Manual (Attachment 3) are provided.
  • Geotechnical Report: Outlines subsurface soil and groundwater conditions, providing recommendations for foundation, earthwork, and pavement design.
  • Wage Rates: Attachment 2 specifies Federal Construction Wage Rates for Cache County, UT.
  • RFIs: Confirmed roof panel type is PBU and roof/soffit gauge is 24 gauge.
  • Site Visit: An attendance sheet from a previous site visit is available, potentially listing interested parties.
  • Contact: Jim Roloff, james.g.roloff@usda.gov, 612-590-7603.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download

Versions

Version 9
Combined Synopsis/Solicitation
Posted: May 8, 2026
View
Version 8
Combined Synopsis/Solicitation
Posted: Apr 29, 2026
View
Version 7
Combined Synopsis/Solicitation
Posted: Apr 24, 2026
View
Version 6Viewing
Combined Synopsis/Solicitation
Posted: Apr 23, 2026
Version 5
Combined Synopsis/Solicitation
Posted: Apr 17, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Apr 17, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Apr 9, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Apr 8, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Mar 30, 2026
View