Kennel Building Construction

SOL #: 12639526Q0088Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Animal And Plant Health Inspection Service
MRPBS MINNEAPOLIS MN
MINNEAPOLIS, MN, 55401, United States

Place of Performance

Millville, UT

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Miscellaneous Buildings (Y1JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 30, 2026
2
Last Updated
May 8, 2026
3
Submission Deadline
Apr 29, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA-APHIS-Wildlife Services is soliciting proposals for the construction of a new Kennel Building for the Predator Research Facility in Millville, UT. This project involves a pre-engineered metal building of approximately 3,400 sq ft, comprising kennel areas A & B, a mud room, and a mechanical room. This is a Total Small Business Set-Aside. Quotes are due by April 29, 2026, at 11 a.m. MT.

Scope of Work

The requirement is for the construction of a new pre-engineered metal kennel building, adhering to the final design documents developed by Cushing Terrell. The facility will support the Predator Research Facility's mission related to carnivore management. Key elements include:

  • Construction of a 3,400 sq ft pre-engineered metal building.
  • Integration of four distinct sections: two kennel areas, a mud room, and a mechanical room.
  • Adherence to comprehensive "100% Construction Documents" (Attachment 4), including architectural, civil, structural, mechanical, plumbing, and electrical drawings.
  • Compliance with the "Kennel Project Manual" (Attachment 3), covering detailed specifications across Divisions 00-33.
  • Site preparation and foundation work based on the provided Geotechnical Study Report, addressing subsurface soil and groundwater conditions.
  • Work must commence within 10 calendar days after Notice to Proceed (NTP) and be completed within 365 days after NTP.

Contract & Timeline

  • Opportunity Type: Combined Synopsis/Solicitation (Request for Quotations - RFQ)
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Estimated Magnitude: Between $1,000,000 and $5,000,000
  • Contract Type: Award will be made on Standard Form 1442.
  • Quotes Due: April 29, 2026, 11 a.m. MT
  • Questions Due: April 24, 2026, 12 p.m. CT
  • Site Visit: April 15, 2026, 10 a.m. MT at the project location.
  • Published Date: April 9, 2026

Submission & Evaluation

Bidders must submit a complete quote package including the RFQ page, a detailed pricing breakdown, demonstration of relevant experience, and past performance information. Quotes should be sent to james.g.roloff@usda.gov. Evaluation will be based on the highest technically rated with a fair and reasonable price, with no tradeoffs between price and non-price factors. Evaluation factors include:

  • Price
  • Technical Capability: Relevant experience with pre-engineered metal buildings, technical approach (work sequencing, critical activities, project management, quality control, safety).
  • Past Performance Bidders must comply with Federal Construction Wage Rates for Cache County, UT (Attachment 2).

Key Documents & Notes

  • Attachment 4_Kennel Drawings.pdf: 100% Construction Documents.
  • Attachment 3_Kennel Project Manual 02162026.pdf: Comprehensive project specifications.
  • Geotech report.pdf: Geotechnical Study Report for site conditions and foundation design.
  • All queries, technical and otherwise, must be directed to the Contracting Officer, Jim Roloff.
  • The solicitation incorporates numerous FAR and AGAR clauses by reference.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download

Versions

Version 9
Combined Synopsis/Solicitation
Posted: May 8, 2026
View
Version 8
Combined Synopsis/Solicitation
Posted: Apr 29, 2026
View
Version 7
Combined Synopsis/Solicitation
Posted: Apr 24, 2026
View
Version 6
Combined Synopsis/Solicitation
Posted: Apr 23, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: Apr 17, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Apr 17, 2026
View
Version 3Viewing
Combined Synopsis/Solicitation
Posted: Apr 9, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Apr 8, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Mar 30, 2026
View