N041--CON-NRM-663A4-23-201 Replace 40 Ton Condenser BLDG 200

SOL #: 36C26026R0035Solicitation

Overview

Buyer

Veterans Affairs
Veterans Affairs, Department Of
260-NETWORK CONTRACT OFFICE 20 (36C260)
VANCOUVER, WA, 98661, United States

Place of Performance

Tacoma, WA

NAICS

Plumbing (238220)

PSC

Installation Of Equipment: Refrigeration, Air Conditioning, And Air Circulating Equipment (N041)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Dec 16, 2025
2
Last Updated
Mar 10, 2026
3
Submission Deadline
Mar 25, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Veterans Affairs (VA), specifically the 260-NETWORK CONTRACT OFFICE 20, is soliciting proposals for Project 663A4-23-201: Replace 40 Ton Condenser at Building 200 at the Puget Sound HCS American Lake VA Medical Center in Tacoma, WA. This is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside for a Firm-Fixed-Price Construction Contract. Proposals are due by March 25, 2026, at 12:00 PM PST.

Scope of Work

This project involves the demolition, removal, and new construction for the replacement of a rooftop-mounted 40-ton refrigerant condenser and its associated infrastructure. This includes condensate piping, refrigerant line-sets, refrigerant evaporators, and the exterior walk-in freezer. All materials must be new and installed per manufacturer's instructions. The contractor is responsible for the disposal of construction debris and hazardous waste in compliance with VA, Federal, and State procedures. Work may be performed during normal campus operational hours, after hours, or on weekends, with specific restrictions for noisy activities in public areas.

Contract Details

  • Contract Type: Firm-Fixed-Price Construction Contract.
  • Solicitation Number: 36C26026R0035.
  • NAICS Code: 238220 (Plumbing, Heating, and Air Conditioning Contractors) with a $19 Million size standard.
  • Period of Performance: Approximately 249 calendar days from the Notice to Proceed.
  • Magnitude of Construction: Expected to be between $2,000,000 and $5,000,000.
  • Warranty: One-year parts and labor warranty from the date of acceptance.
  • Requirements: A bid guarantee is required, and Performance and Payment Bonds, along with insurance coverage documentation, are required within ten calendar days of Notice of Award.

Submission & Evaluation

This will be issued as a Request for Proposal (RFP) in accordance with FAR Parts 15, 19, and 36. Evaluation will be based on a best-value tradeoff source selection process, considering: Key Personnel and Capacity, Technical Approach, Past Performance, and Price. Factors 1 and 2 are more important than Factor 3, and Factors 1-3 combined are significantly more important than Factor 4 (Price). Proposals must be submitted electronically. Proposals received from other than SDVOSB concerns will not be considered.

Key Requirements & Notes

  • Site Visit: A site visit was conducted on March 3, 2026, and the sign-in sheet has been provided as an amendment.
  • Questions Due: All questions must be submitted in writing to kaycee.benson@va.gov and ty.draszt@va.gov by March 6, 2026, at 12:00 PM PST.
  • Compliance: Bidders must adhere to specific VA requirements including Pre-Construction Risk Assessment (PCRA), Infection Control Risk Assessment (ICRA), Contractor Rules of Behavior, and Limitations on Subcontracting (not more than 85% of the amount paid by the government to non-SDVOSB/VOSB firms for general construction). Prevailing wage rates for Pierce County, WA, must be used for labor cost estimation. A Past Performance Questionnaire is part of the evaluation.
  • Documentation: The solicitation includes detailed drawings (Addendum 2 dated Feb 13, 2026) and specifications, which bidders must review carefully.

People

Points of Contact

Kaycee D Benson, ContractorContract SpecialistPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 5
Solicitation
Posted: Mar 10, 2026
View
Version 4Viewing
Solicitation
Posted: Mar 4, 2026
Version 3
Solicitation
Posted: Feb 24, 2026
View
Version 2
Pre-Solicitation
Posted: Feb 24, 2026
View
Version 1
Pre-Solicitation
Posted: Dec 16, 2025
View
N041--CON-NRM-663A4-23-201 Replace 40 Ton Condenser BLDG 200 | GovScope