N041--CON-NRM-663A4-23-201 Replace 40 Ton Condenser BLDG 200

SOL #: 36C26026R0035Solicitation

Overview

Buyer

Veterans Affairs
Veterans Affairs, Department Of
260-NETWORK CONTRACT OFFICE 20 (36C260)
VANCOUVER, WA, 98661, United States

Place of Performance

Tacoma, WA

NAICS

Plumbing (238220)

PSC

Installation Of Equipment: Refrigeration, Air Conditioning, And Air Circulating Equipment (N041)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)

Timeline

1
Posted
Dec 16, 2025
2
Last Updated
Apr 23, 2026
3
Submission Deadline
Apr 24, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Veterans Affairs (VA), Network Contracting Office 20, is soliciting proposals for a Firm-Fixed-Price Construction Contract to replace a 40-ton refrigerant condenser and associated infrastructure at Building 200 of the Puget Sound VA Medical Center, American Lake Campus in Tacoma, WA. This is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside. Proposals are due by April 24, 2026, at 10:00 AM PST.

Scope of Work

The project, identified as Solicitation 36C26026R0035 (Project 663A4-23-201), involves the demolition, removal, and new construction for the replacement of a rooftop-mounted 40-ton refrigerant condenser. This includes associated apparatus and infrastructure such as condensate piping, refrigerant line-sets, refrigerant evaporators, and the exterior walk-in freezer. The contractor must provide all labor, material, and equipment, ensuring new materials are installed per manufacturer's instructions. Demolition and disposal of construction debris and hazardous waste, including assumed asbestos in the roof, must comply with VA policies and environmental regulations. The VA will provide a temporary mobile freezer, but the contractor is responsible for providing the generator, ramps, stairs, or doors for VA staff access. Work may occur during normal hours, after hours, or on weekends, requiring strict coordination with the COR.

Contract Details

  • Contract Type: Firm-Fixed-Price Construction Contract.
  • Solicitation Number: 36C26026R0035.
  • NAICS Code: 238220 (Plumbing, Heating, and Air Conditioning Contractors) with a $19 Million size standard.
  • Set-Aside: 100% Service-Disabled Veteran-Owned Small Business (SDVOSB).
  • Magnitude of Construction: Estimated between $1,000,000 and $5,000,000.
  • Period of Performance: Approximately 249 calendar days from the Notice to Proceed.
  • Warranty: One-year parts and labor warranty from the date of acceptance.
  • Bonds/Insurance: A bid guarantee is required. Performance and Payment Bonds, along with required insurance coverage documentation, are due within ten calendar days of the Notice of Award.
  • Subcontracting Limitations: Contractors cannot pay more than 85% of the amount received from the government to firms that are not certified SDVOSBs or VOSBs. A mandatory certification of compliance is required.

Submission & Evaluation

Proposals must be submitted electronically by the deadline. The evaluation will follow a best-value tradeoff source selection process, considering:

  1. Key Personnel and Capacity
  2. Technical Approach
  3. Past Performance
  4. Price Factors 1 and 2 are more important than Factor 3, and Factors 1-3 combined are significantly more important than Factor 4 (Price). Key personnel qualifications have been clarified, removing requirements for elevator construction licenses and Certified Elevator Technicians. Subcontractor personnel can meet key personnel qualifications. Bidders must use "Attachment 9 - Division Cost Breakout Version 2" for cost proposals. Offerors must acknowledge all amendments.

Important Dates & Contacts

  • Proposals Due: April 24, 2026, at 10:00 AM PST.
  • Contact: Kaycee D Benson, Contract Specialist, kaycee.benson@va.gov.

People

Points of Contact

Kaycee D Benson, ContractorContract SpecialistPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 10
Solicitation
Posted: Apr 23, 2026
View
Version 9
Solicitation
Posted: Apr 22, 2026
View
Version 8Viewing
Solicitation
Posted: Apr 20, 2026
Version 7
Solicitation
Posted: Apr 7, 2026
View
Version 6
Solicitation
Posted: Mar 25, 2026
View
Version 5
Solicitation
Posted: Mar 10, 2026
View
Version 4
Solicitation
Posted: Mar 4, 2026
View
Version 3
Solicitation
Posted: Feb 24, 2026
View
Version 2
Pre-Solicitation
Posted: Feb 24, 2026
View
Version 1
Pre-Solicitation
Posted: Dec 16, 2025
View