N041--CON-NRM-663A4-23-201 Replace 40 Ton Condenser BLDG 200
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of Veterans Affairs (VA), Network Contract Office 20, is soliciting proposals for a Firm-Fixed-Price Construction Contract to replace a 40-ton condenser at Building 200 of the VA Puget Sound Medical Center, American Lake Campus in Tacoma, WA. This is a Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside. Proposals are due by April 24, 2026, at 10:00 AM PST.
Scope of Work
The project, identified as Project 663A4-23-201, involves the demolition, removal, and new construction for the replacement of a rooftop-mounted 40-ton refrigerant condenser and its associated infrastructure. This includes condensate piping, refrigerant line-sets, refrigerant evaporators, and the exterior walk-in freezer. The contractor must provide all labor, materials, and equipment, ensuring new materials are installed per manufacturer's instructions. Disposal of construction debris and hazardous waste must comply with VA, Federal, and State procedures. The period of performance is approximately 249 calendar days from the Notice to Proceed.
Contract Details
- Contract Type: Firm-Fixed-Price Construction Contract.
- Solicitation Number: 36C26026R0035.
- Set-Aside: 100% Service-Disabled Veteran-Owned Small Business (SDVOSB).
- NAICS Code: 238220 (Plumbing, Heating, and Air Conditioning Contractors) with a $19 Million size standard.
- Magnitude: Expected to be between $2,000,000 and $5,000,000.
- Place of Performance: Building 200, American Lake Campus, Tacoma, WA.
- Requirements: A bid guarantee, performance and payment bonds, and insurance coverage documentation are required. A one-year parts and labor warranty is also mandatory.
Submission & Evaluation
- Proposal Due Date: April 24, 2026, 10:00 AM PST.
- Submission Method: Electronically via email (as per previous instructions).
- Evaluation: Best-value tradeoff source selection based on:
- Key Personnel and Capacity (qualifications for elevator construction/CETs have been removed).
- Technical Approach (a specific paragraph from RFP Page 52, Factor 2 has been deleted).
- Past Performance (requires completion of Attachment 8 - Past Performance Questionnaire).
- Price (requires use of Attachment 9 - Division Cost Breakout Version 2). Factors 1 and 2 are more important than Factor 3, and Factors 1-3 combined are significantly more important than Factor 4.
- Site Visits: A second site visit is scheduled for April 13, 2026, at 9:00 AM PST. Attendees must arrive on time at the front courtyard of Building 18A.
- Amendments: Offerors must acknowledge all amendments.
Key Attachments & Requirements
Bidders must review detailed Drawings (Attachment 2) and Specifications (Attachment 3 - Addendum 2). Compliance with VHA Pre-Construction Risk Assessment (PCRA) (Attachment 5) and VHA Infection Control Risk Assessment (ICRA) (Attachment 4) is critical for working in a healthcare environment. Attachment 7 - Contractor Rules of Behavior outlines mandatory security protocols. Attachment 6 - Limitations on Subcontracting requires certification of compliance. Bidders must also adhere to Pierce County Wage Rates (Attachment 10).