N041--CON-NRM-663A4-23-201 Replace 40 Ton Condenser BLDG 200
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of Veterans Affairs (VA), Network Contracting Office 20, is soliciting proposals for a Firm-Fixed-Price Construction Contract to replace a 40-ton condenser at Building 200 of the Puget Sound HCS American Lake VA Medical Center in Lakewood, WA. This opportunity is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside. Proposals are due by April 24, 2026, at 10:00 AM PST.
Scope of Work
The project, identified as 663A4-23-201, involves the demolition, removal, and new construction for the replacement of a rooftop-mounted 40-ton refrigerant condenser and its associated infrastructure. This includes condensate piping, refrigerant line-sets, refrigerant evaporators, and the exterior walk-in freezer. The contractor must provide all labor, materials, and equipment, ensuring materials are new and installed per manufacturer's instructions. Demolition and disposal of construction debris and hazardous waste must comply with VA policies and environmental regulations. Work may occur during or after normal campus operational hours.
Contract Details
- Contract Type: Firm-Fixed-Price Construction Contract.
- Solicitation Number: 36C26026R0035.
- NAICS Code: 238220 (Plumbing, Heating, and Air Conditioning Contractors) with a $19 Million size standard.
- Magnitude of Construction: Estimated between $1,000,000 and $5,000,000.
- Period of Performance: Approximately 249 calendar days from the Notice to Proceed.
- Warranty: One-year parts and labor warranty from the date of acceptance.
- Bonds: A bid guarantee is required, and Performance and Payment Bonds are mandatory within ten calendar days of Notice of Award.
Submission & Evaluation
Proposals must be submitted electronically. Evaluation will follow a best-value tradeoff source selection process, considering:
- Key Personnel and Capacity
- Technical Approach
- Past Performance
- Price Factors 1 and 2 are more important than Factor 3, and Factors 1-3 combined are significantly more important than Factor 4 (Price). Clarifications indicate that key personnel requirements for elevator construction/CETs have been deleted. For Mentor-Protégé Joint Ventures, the Protégé's applicable past performance will be evaluated with the Mentor's; otherwise, only the Mentor's will be considered. Offerors must use the updated "Attachment 9 - Division Cost Breakout Version 2" for pricing.
Key Documents & Clarifications
Multiple amendments have been issued, including:
- Amendment 0004 extended the proposal deadline to April 24, 2026, and scheduled a second site visit for April 13, 2026.
- Amendment 0002 and subsequent Q&A documents clarified errors, updated Attachment 9, and revised key personnel qualifications.
- Contractor Questions and Answers (April 20, 2026) provided details on SDVOSB certification, asbestos abatement, temporary freezer requirements, roof leak responsibilities, and contract magnitude.
- Mandatory attachments include the Statement of Work, Drawings, Specifications (Addendum 2), ICRA/PCRA forms, Contractor Rules of Behavior, Limitations on Subcontracting, Past Performance Questionnaire, and Wage Rates.
Contact Information
For questions, contact Kaycee D Benson at kaycee.benson@va.gov.