Raul Hector Castro Douglas AZ Land Port of Entry Design-Build
SOL #: 47PK0125R0002Solicitation
Overview
Buyer
General Services Administration
Public Buildings Service
PBS R9 AMD CAPITAL PROJECTS
SAN FRANCISCO, CA, 94102, United States
Place of Performance
Douglas, AZ
NAICS
Commercial and Institutional Building Construction (236220)
PSC
Construction Of Other Administrative Facilities And Service Buildings (Y1AZ)
Set Aside
No set aside specified
Original Source
Timeline
1
Posted
Jan 14, 2026
2
Last Updated
Apr 8, 2026
3
Submission Deadline
Apr 16, 2026, 10:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The General Services Administration (GSA) is seeking a Design-Build (DB) General Construction Contractor for the Raul Hector Castro (RHC) Land Port of Entry (LPOE) in Douglas, AZ. This Firm-Fixed-Price solicitation (No. 47PK0125R0002) involves the demolition, modernization, and expansion of the existing port while maintaining continuous operations. Proposals are due April 16, 2026.
Scope of Work
The project encompasses the comprehensive design and construction of the RHC LPOE at 15 Pan American Ave, Douglas, AZ 85607. Key deliverables include:
- Demolition and modernization of existing facilities.
- Expansion of the Port to the west and north of the current site.
- Maintaining continuous operation of commercial and non-commercial inspection activities throughout the construction period.
- Submission of a detailed Project Schedule within 90 days of Notice to Proceed (NTP).
- Preparation and submission of various submittals, including shop drawings, samples, and product information.
Contract Details
- Contract Type: Firm-Fixed-Price Design-Build (DB).
- Period of Performance: Design Phase commences 1 day after NTP. Substantial Completion is required no later than 1916 calendar days from NTP, with Contract Completion within 90 calendar days thereafter.
- Liquidated Damages: $10,093.36 per calendar day for delays in achieving Substantial Completion.
- Set-Aside: None specified. A Small Business Subcontracting Plan is required for large businesses.
- Bid Guarantee: 20% of the bid price or $3,000,000, whichever is less.
- Insurance: Commercial General Liability ($5M per occurrence), Comprehensive Automobile Liability ($1M/$2.5M), and Workers' Compensation are required.
- Wage Determination: Prevailing wage rates for Cochise County, AZ, apply (General Decision Number AZ20260038).
Submission & Evaluation
- Proposal Due Date: April 16, 2026 (extended per Amendment 004).
- Proposal Contents: Must include a Price Proposal, Technical Proposal (max 35 digital pages), Representations and Certifications, Standard Form 24 (Bid Bond), Subcontracting Plan, GSA Form 527 (Contractor's Qualifications and Financial Information), and Proprietary Information Agreement(s).
- Format: Emailed electronic versions, with a 25MB per email size limit.
- Evaluation Method: Best Value Tradeoff. Non-price factors (Past Experience of General Contractor, Technical and Management Approach, Lead Designer, Past Performance of General Contractor, Small Business Utilization) are significantly more important than the Total Evaluated Price.
- Mandatory Requirements: Active SAM registration, completed SF 1442.
- Organizational Conflicts of Interest: Firms associated with Line and Space, Stantec, Inc., and Rider Levett Bucknall may have an OCI.
Key Dates & Information Access
- Virtual Pre-Proposal Conference: February 17, 2026, 10:00 AM Mountain Time. RSVP by February 12, 2026.
- Site Visit: February 25, 2026, 1:00 PM Mountain Time. RSVP by February 19, 2026, 3:00 PM Pacific Time (per Amendment 002). A U.S. Customs and Border Protection (CBP) security quick-check is required for attendees.
- RFI Submission Deadline: April 1, 2026 (extended per Amendment 005).
- Document Access: A GSA Affiliated Customer Account (GACA) is required to access the Statement of Work and other attachments. Instructions are provided in the "GACA Instructions.pdf" document. Email daniel.ramirez@gsa.gov to request access.
- Contact: Daniel Ramirez, daniel.ramirez@gsa.gov.
People
Points of Contact
Daniel RamirezPRIMARY
Files
Versions
Version 10Viewing
Solicitation
Posted: Apr 8, 2026
Version 9
Solicitation
Posted: Apr 1, 2026
Version 8
Solicitation
Posted: Mar 26, 2026
Version 7
Solicitation
Posted: Mar 10, 2026
Version 6
Solicitation
Posted: Feb 25, 2026
Version 5
Solicitation
Posted: Feb 19, 2026
Version 4
Solicitation
Posted: Feb 18, 2026
Version 3
Solicitation
Posted: Feb 13, 2026
Version 2
Solicitation
Posted: Feb 2, 2026
Version 1
Pre-Solicitation
Posted: Jan 14, 2026