VISN 7 CONSTRUCTION MATOC 36C24726R0026 - SOLICITATION

SOL #: 36C24726R0026Solicitation

Overview

Buyer

Veterans Affairs
Veterans Affairs, Department Of
247-NETWORK CONTRACT OFFICE 7 (36C247)
AUGUSTA, GA, 30904, United States

Place of Performance

Decatur, GA

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Hospitals And Infirmaries (Y1DA)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)

Timeline

1
Posted
Dec 2, 2025
2
Last Updated
Jun 15, 2026
3
Submission Deadline
Jun 17, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Veterans Affairs (VA), Network Contracting Office 7, has issued a Solicitation for a VISN 7 Construction Multiple Award Task Order Contract (MATOC). This Indefinite-Delivery, Indefinite-Quantity (IDIQ) contract will provide a broad range of construction, maintenance, alteration, and repair services for real property at eight major VISN 7 medical facilities and other VA-owned facilities across Alabama, Georgia, and South Carolina.

This opportunity is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside. Proposals are due by June 17, 2026, at 2:00 PM Eastern Time.

Scope of Work

The MATOC will cover diverse construction activities, including demolition, renovation, new construction, and alterations. Specific trades include civil, HVAC, mechanical, electrical, plumbing, fire protection, life safety, architectural, carpentry, flooring, masonry, earthwork, concrete, and asphalt paving. The solicitation includes three seed projects:

  • Seed 1 (Charleston VAMC): Renovation of restrooms, stairwells, and doors, involving asbestos abatement, lead paint removal, ICRA Level IV precautions, and specific material specifications. Personnel for Seed 1 may be dual-hatted for Superintendent, SSHO, and QC Manager roles. The Period of Performance is 475 Days.
  • Seed 2 (Carl Vinson VA Medical Center, Dublin, GA): Relocation of Radiology & Nuclear Medicine, requiring specialized medical equipment installation (CT, MRI, X-ray, Ultrasound), radiation shielding, and medical gas systems. For Seed 2, Superintendent, SSHO, and QC Manager roles must be filled by separate full-time individuals.
  • Seed 3 (Tuskegee VAMC): Correction of egress door deficiencies, including door/frame replacement and integration with electrical, safety, and security systems.

Contract Details

  • Contract Type: Indefinite Delivery, Indefinite Quantity (IDIQ) Construction MATOC, with firm-fixed price task orders.
  • Ordering Period: Five years from the date of award.
  • Maximum Aggregate Value: $900,000,000.
  • Minimum Order Guarantee: $1,000 per contract.
  • Task Order Magnitude: $2,000 to $30,000,000.
  • Set-Aside: 100% Service-Disabled Veteran-Owned Small Business (SDVOSB).

Eligibility & Submission Requirements

  • Eligibility: Offerors must be certified SDVOSBs in the SBA database at the time of submission and award, registered in SAM.gov, and comply with VETS 4212 reporting.
  • Proposal Due Date: June 17, 2026, at 2:00 PM Eastern Time.
  • Submission: One electronic copy of the technical and price proposal via email, and four hard copies of the technical proposal per seed project proposed. Overnight courier is acceptable.
  • Technical Proposal: Limited to 40 pages. Attachments such as Surety Letters, EMR Letters, and Certifications do not count towards the page limit.
  • Past Performance: All six submitted projects must have been awarded, executed, or completed within five years from the proposal due date, with a minimum of two projects exceeding $1,000,000. Past Performance Questionnaires (PPQs) must be submitted directly by the reference to the government.
  • Bonding: Bid bonds are required for each seed project proposed. The SBA Bond Guarantee Program is acceptable, and a surety letter on letterhead is sufficient.
  • Safety: An Experience Modification Rate (EMR) greater than 1.0 or specific OSHA violations (four serious, one repeat, or one willful within three years) may lead to disqualification.
  • Invoicing: Mandatory electronic submission via Tungsten Network e-Invoicing.
  • Subcontracting: VAAR 852.219-75 applies; for general construction, not more than 85% of the contract amount can be paid to non-SDVOSB/VOSB firms. A mandatory certification is required.

Amendments & Contacts

Multiple amendments (0001-0006) have been issued, clarifying requirements, extending the due date, and providing RFI responses. No new RFIs are being accepted. Primary contact is Elissa Goodman at elissa.goodman@va.gov or (352) 231-6751.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 16
Solicitation
Posted: Jun 15, 2026
View
Version 15
Solicitation
Posted: Jun 9, 2026
View
Version 14
Solicitation
Posted: Jun 2, 2026
View
Version 13
Solicitation
Posted: May 27, 2026
View
Version 12
Solicitation
Posted: May 26, 2026
View
Version 11
Solicitation
Posted: May 22, 2026
View
Version 10Viewing
Solicitation
Posted: May 22, 2026
Version 9
Solicitation
Posted: May 14, 2026
View
Version 8
Solicitation
Posted: May 12, 2026
View
Version 7
Solicitation
Posted: Apr 27, 2026
View
Version 6
Solicitation
Posted: Apr 27, 2026
View
Version 5
Solicitation
Posted: Apr 24, 2026
View
Version 4
Solicitation
Posted: Apr 14, 2026
View
Version 3
Solicitation
Posted: Apr 8, 2026
View
Version 2
Pre-Solicitation
Posted: Feb 9, 2026
View
Version 1
Sources Sought
Posted: Dec 2, 2025
View