TINKER AFB MAC BOA WWYK150083 - Repair Transformer Vault 6, B9001

SOL #: FA813726R0008Pre-Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA8137 AFSC PZIOC
TINKER AFB, OK, 73145-9125, United States

Place of Performance

S Coffeyville, OK

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Restoration Of Real Property (Public Or Private) (Z2QA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 21, 2026
2
Last Updated
Apr 9, 2026
3
Response Deadline
Apr 14, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting proposals for WWYK150083 - Repair Transformer Vault 6, B9001 at Tinker Air Force Base, Oklahoma. This project involves the repair and replacement of critical electrical infrastructure. This opportunity is a Total Small Business Set-Aside and is restricted to Tinker AFB MAC BOA Holders only. Proposals are due by April 14, 2026, at 4:00 PM CST.

Scope of Work

The project requires furnishing all materials, labor, and equipment to repair and replace two gas-filled 2000KVA transformers, associated 480V switch gear (labeled #6C and #6D), all 15KV switches, and the original 3000A tie bus within Transformer Vault 6, Building 9001. These components have exceeded their rated life expectancy. Additional work includes repairing interior lighting, adding visual fire alarm notification devices to meet ABA requirements, and repairing the vault's exterior. The contractor must perform a site investigation to verify existing conditions and identify necessary logistical, architectural, and structural work.

Contract Details

This is a Firm Fixed-Price contract with an estimated magnitude between $1,000,000 and $5,000,000. The Period of Performance (POP) is 271 calendar days for completion, with work to commence 10 calendar days after Notice to Proceed. Liquidated Damages of $277.75 per calendar day will be assessed for delays. The project will follow the 2025 Tinker AFB Electrical Standards.

Eligibility & Key Requirements

This solicitation is exclusively for Tinker AFB MAC BOA Holders. A mandatory initial site visit was held on February 5, 2026, and attendance was required for eligibility to propose. The government has provided responses to pre-bid RFIs, clarifying technical details such as transformer type (gas-filled, no PCBs), busway transition (custom adapters), and the requirement for contractors to provide their own hoist system due to damage to the existing one. Phased demo work is required to minimize production impact, and arc-flash mitigation techniques (not arc-resistant gear) shall be used. The testing organization must be a first-tier subcontractor with NETA Level III or NICET certified technicians.

Important Dates

  • Proposal Due Date: April 14, 2026, at 4:00 PM CST (Extended by Amendment 3).
  • Additional RFI Questions Due: March 25, 2026, at 4:00 PM CST (from Amendment 2).
  • Initial Site Visit: February 5, 2026 (Mandatory for eligibility).

Evaluation

Proposals will be evaluated using Lowest Priced Technically Acceptable (LPTA) Source Selection procedures, focusing on technical acceptability and price.

Contact Information

For questions, contact Sara Hinds (sara.hinds.2@us.af.mil) or Megan Donaghe (megan.donaghe@us.af.mil, 7303205014).

People

Points of Contact

Sara HindsPRIMARY
Megan DonagheSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 12Viewing
Pre-Solicitation
Posted: Apr 9, 2026
Version 11
Pre-Solicitation
Posted: Apr 6, 2026
View
Version 10
Pre-Solicitation
Posted: Mar 25, 2026
View
Version 9
Pre-Solicitation
Posted: Mar 25, 2026
View
Version 8
Pre-Solicitation
Posted: Mar 24, 2026
View
Version 7
Pre-Solicitation
Posted: Mar 23, 2026
View
Version 6
Pre-Solicitation
Posted: Mar 13, 2026
View
Version 5
Pre-Solicitation
Posted: Mar 12, 2026
View
Version 4
Pre-Solicitation
Posted: Mar 4, 2026
View
Version 3
Pre-Solicitation
Posted: Feb 17, 2026
View
Version 2
Pre-Solicitation
Posted: Feb 2, 2026
View
Version 1
Pre-Solicitation
Posted: Jan 21, 2026
View
TINKER AFB MAC BOA WWYK150083 - Repair Transformer Vault 6, B9001 | GovScope