Davidson River Campground Brevard Sewer Project

SOL #: 12445226Q0005Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA EAST 12
Atlanta, GA, 303092449, United States

Place of Performance

Pisgah Forest, NC

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Construction Of Sewage And Waste Facilities (Y1ND)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 22, 2026
2
Last Updated
Mar 6, 2026
3
Submission Deadline
Mar 2, 2026, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service is seeking quotations for the Davidson River Campground Brevard Sewer Project in Pisgah Forest, NC. This project involves replacing existing sewer infrastructure to connect the Davidson River Campground and Pisgah Ranger District facilities to the City of Brevard Wastewater Collection System. The estimated magnitude of this construction project is between $1,000,000 and $5,000,000. This is a Total Small Business Set-Aside. Proposals are due March 2, 2026, at 5:00 P.M. Eastern Time.

Scope of Work

The primary objective is to replace the failing Schenck Job Corps pump station and existing force main. This will address significant sewer surcharges and Sanitary Sewer Overflows by connecting the facilities north of US 276 to the municipal wastewater system. Key technical specifications include demolition, clearing, grading, excavation, trenching, erosion control, paving, concrete work, water distribution, gravity and pressure sewer installation, piping, valves, horizontal directional drilling, electrical systems, standby power, and submersible sewage pumps.

Contract Details

  • Contract Type: Combined Synopsis/Solicitation (RFQ), anticipated Firm-Fixed Price.
  • Set-Aside: Total Small Business Set-Aside.
  • NAICS Code: 237110 (Construction Of Sewage And Waste Facilities) with a $45 million size standard.
  • Magnitude: Between $1,000,000 and $5,000,000.
  • Bonds: Performance and Payment Bonds are required, each for 100% of the original contract award price, due 5 days after award. Irrevocable letters of credit or SF-25A/SF-25 forms are allowed.
  • Offer Acceptance: Prices must be held firm for 90 calendar days.

Submission & Evaluation

  • Proposal Due Date: March 2, 2026, at 5:00 P.M. Eastern Time.
  • Questions Due: February 13, 2026, at 12:00 P.M. Eastern Time, via email to jalisa.sims@usda.gov.
  • Site Visit: Highly encouraged on February 5, 2026, at 10:00 A.M. ET at 1346 Pisgah Highway, Pisgah Forest, NC. RSVP is required.
  • Evaluation Criteria: Award will be made to the offeror with the highest technically rated quotation, considering fair and reasonable pricing and acceptable or neutral past performance. Tradeoffs will not be conducted.
  • Technical Approach: Requires a brief narrative of the overall approach, including task sequence, understanding of trades, subcontractor management, risk mitigation, and key personnel. Offerors must submit three (3) relevant construction projects (prime contractor, $250k+, water/wastewater utility work, completed within 7 years).
  • Pricing: Submit Attachment 5-DRCG Brevard Sewer SOI (Schedule A Bid Form).
  • Past Performance: Assessed based on three (3) relevant construction projects, using a Past Performance Questionnaire (Attachment 8), CPARS, or CCASS reports.
  • Required Documents: Bid Guarantee, Technical Approach, Past Performance Questionnaire Template, and Schedule of Items. Acknowledge amendments via SF-30.

Key Attachments

  • Attachment 1: Solicitation Terms and Conditions (includes clauses, instructions, evaluation criteria).
  • Attachment 2: Technical Specifications (detailed requirements for sewer system improvements).
  • Attachment 3: Measurement and Payment (outlines how work will be measured and compensated).
  • Attachment 4: Final Plans (index to project drawings).
  • Attachment 5: Schedule A Bid Form (for pricing submission).
  • Attachment 6: Davis-Bacon Wage Determination (for labor cost estimation).
  • Attachment 7: Site Visit Information.
  • Attachment 8: Past Performance Questionnaire Template.

Contact Information

People

Points of Contact

SIMS, JALISA CPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 8
Combined Synopsis/Solicitation
Posted: Mar 6, 2026
View
Version 7
Combined Synopsis/Solicitation
Posted: Mar 4, 2026
View
Version 6
Combined Synopsis/Solicitation
Posted: Mar 3, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: Feb 27, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Feb 26, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Feb 26, 2026
View
Version 2Viewing
Combined Synopsis/Solicitation
Posted: Jan 23, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Jan 22, 2026
View