Davidson River Campground Brevard Sewer Project

SOL #: 12445226Q0005Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA EAST 12
Atlanta, GA, 303092449, United States

Place of Performance

Pisgah Forest, NC

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Construction Of Sewage And Waste Facilities (Y1ND)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 22, 2026
2
Last Updated
Mar 6, 2026
3
Submission Deadline
Mar 12, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service is soliciting quotations for the Davidson River Campground Brevard Sewer Project, a Total Small Business Set-Aside construction opportunity. This project involves replacing failing pump station and force main infrastructure to connect the Davidson River Campground and Pisgah Ranger District facilities to the City of Brevard Wastewater Collection System. Quotes are due March 12, 2026, at 5:00 PM EDT.

Scope of Work

This project requires the replacement of the existing Schenck Job Corps pump station and force main. The primary objective is to establish a connection between the Davidson River Campground and Pisgah Ranger District facilities (north of US 276) and the City of Brevard Wastewater Collection System. The current infrastructure is failing, leading to significant sewer surcharges and Sanitary Sewer Overflows. Key deliverables include demolition, clearing, grading, excavation, trenching, erosion control, paving, concrete work, water distribution, gravity and pressure sewer installation, piping, valves, appurtenances, horizontal directional drilling, electrical systems, and standby power. The contract completion time is 270 calendar days from the notice to proceed.

Contract Details

This is a Combined Synopsis/Solicitation issued as a Request for Quotation (RFQ), with an anticipated Firm-Fixed-Price contract. The magnitude of the construction project is estimated between $1,000,000 and $5,000,000. Performance and Payment Bonds are required, each for 100% of the original contract award price, due 5 days after award. Alternatives like an irrevocable letter of credit or SF-25A/SF-25 forms are allowed.

Submission & Evaluation

Quotes are due by March 12, 2026, at 5:00 PM EDT. Questions were due by February 13, 2026. A site visit was highly encouraged on February 5, 2026. Evaluation will be based on the highest technically rated quotation with fair and reasonable pricing and acceptable or neutral past performance; tradeoffs will not be conducted. Offerors must submit:

  • Acknowledgement of amendments.
  • A Bid Guarantee.
  • A Technical Approach (limited to six 8.5x11 pages) detailing three relevant construction projects ($250k+, water/wastewater utility work, completed within 7 years), an overall approach narrative, and addressing challenges like maintaining sewer service and environmental impacts.
  • Past Performance information via a questionnaire, CPARS, or CCASS report.
  • A Schedule of Items (Attachment 5-DRCG Brevard Sewer SOI). Offerors must hold prices firm for 90 calendar days.

Additional Notes

This acquisition is a Total Small Business Set-Aside under NAICS 237110 (Water and Sewer Line and Related Structures Construction) with a size standard of $45 million. The place of performance is Pisgah Forest, NC. The primary contact is Jalisa C. Sims at jalisa.sims@usda.gov. Amendment 0001 posted Q&A and revised documents.

People

Points of Contact

SIMS, JALISA CPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 8
Combined Synopsis/Solicitation
Posted: Mar 6, 2026
View
Version 7
Combined Synopsis/Solicitation
Posted: Mar 4, 2026
View
Version 6
Combined Synopsis/Solicitation
Posted: Mar 3, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: Feb 27, 2026
View
Version 4Viewing
Combined Synopsis/Solicitation
Posted: Feb 26, 2026
Version 3
Combined Synopsis/Solicitation
Posted: Feb 26, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Jan 23, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Jan 22, 2026
View