Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The USDA Forest Service is soliciting quotations for the Davidson River Campground Brevard Sewer Project in Pisgah Forest, NC. This project involves replacing the existing Schenck Job Corps pump station and force main to connect the Davidson River Campground and Pisgah Ranger District facilities to the City of Brevard Wastewater Collection System. This is a Total Small Business Set-Aside with an estimated magnitude between $1,000,000 and $5,000,000. Quotations are due March 11, 2026, at 5:00 PM EST.
Scope of Work
The project requires the replacement of the existing Schenck Job Corps pump station and force main. The new infrastructure will connect the Davidson River Campground and Pisgah Ranger District facilities, located north of US 276, to the City of Brevard Wastewater Collection System. This initiative aims to address failing infrastructure, reduce significant sewer surcharges to the Forest Service, and mitigate Sanitary Sewer Overflows. Detailed technical specifications, measurement and payment information, and final plans are provided in attachments. The contract completion time is 270 calendar days from the notice to proceed.
Contract Details
- Type: Combined Synopsis/Solicitation (RFQ), anticipated Firm-Fixed-Price contract.
- Magnitude: Between $1,000,000 and $5,000,000.
- Set-Aside: Total Small Business Set-Aside (NAICS 237110, size standard $45 million).
- Bid Guarantee: Required at 30% of the bid price or $3,000,000, whichever is less.
- Performance & Payment Bonds: Required at 100% of the original contract award price, due 5 days after award. Irrevocable letter of credit or SF-25A/SF-25 forms are allowed.
Submission & Evaluation
- Quotations Due: March 11, 2026, at 5:00 PM EST.
- Evaluation Criteria: Award will be made to the offeror with the highest technically rated quotation, considering fair and reasonable pricing and acceptable or neutral past performance. Tradeoffs will not be conducted.
- Technical Approach: Must include three relevant construction projects ($250,000+, completed within 7 years, involving water/wastewater utility work, trenchless installation, and/or pump station construction). A narrative detailing the overall approach, task sequencing, understanding of trades, subcontractor management, risk mitigation, key personnel, and addressing challenges like maintaining sewer service and environmental impacts is required.
- Past Performance: Submit information on the three relevant projects via questionnaire, CPARS/CCASS report, or equivalent.
- Required Documents: Solicitation Amendments, Bid Guarantee, Technical Approach, Past Performance Questionnaire/CPARS, and Schedule of Items (Attachment 5- Revised DRCG Brevard Sewer SOI.pdf).
- Offer Acceptance Period: 90 calendar days from the receipt of offers.
Additional Notes
A site visit was highly encouraged on February 5, 2026, and questions were due by February 13, 2026. Offerors must acknowledge all solicitation amendments. The Davis-Bacon Wage Determination (NC20260061) applies to this project.