Davidson River Campground Brevard Sewer Project
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The USDA Forest Service is soliciting proposals for the Davidson River Campground Brevard Sewer Project in Pisgah Forest, NC. This project involves replacing an existing pump station and force main to connect facilities to the City of Brevard Wastewater Collection System. The estimated magnitude is between $1,000,000 and $5,000,000. This is a Total Small Business Set-Aside. Offers are due March 12, 2026, at 5:00 PM EST.
Project Overview
This combined synopsis/solicitation (RFQ) seeks to address failing infrastructure, significant sewer surcharges, and Sanitary Sewer Overflows by replacing the existing Schenck Job Corps pump station and force main. The project will connect the Davidson River Campground and Pisgah Ranger District facilities north of US 276 to the City of Brevard Wastewater Collection System. The anticipated contract type is Firm-Fixed Price, with a completion time of 270 calendar days from the Notice to Proceed.
Key Requirements & Deliverables
The scope includes demolition, clearing, grading, and excavation. Key installations involve gravity and pressure sewer lines, force mains (utilizing both open cut and horizontal directional drilling methods), and the construction of new lift stations complete with pumps, electrical systems, generators, and concrete structures. Other deliverables include pavement replacement, sediment and erosion control, and comprehensive sewer system testing (Mandrel/Deflection, Air/Infiltration, Manhole Vacuum). Compliance with the Davis-Bacon Wage Determination for North Carolina is mandatory. Performance and Payment Bonds, each at 100% of the original contract award price, are required within 5 days of award, with a Bid Guarantee of 100% of the bid price also necessary.
Submission & Evaluation
Offers are due by March 12, 2026, at 5:00 PM EST. Questions were due February 13, 2026. A highly encouraged site visit was held on February 5, 2026. Evaluation will be based on the highest technically rated quotation with fair and reasonable pricing and acceptable or neutral past performance; tradeoffs will not be conducted. The technical approach must demonstrate experience with three relevant construction projects ($250,000+, completed within 7 years, involving water/wastewater utility work, trenchless installation, or pump station construction), along with a narrative detailing the overall approach, risk mitigation, maintaining sewer service, and environmental impacts. Past performance will be assessed via a provided questionnaire, CPARS, or CCASS. Required submission documents include acknowledged amendments, Bid Guarantee, Technical Approach, Past Performance Questionnaire, and the Schedule of Items (Attachment 5). Quotes must remain firm for 90 calendar days.
Eligibility & Set-Aside
This acquisition is a Total Small Business Set-Aside. The applicable NAICS Code is 237110 (Construction Of Sewage And Waste Facilities), with a small business size standard of $45 million.