Lake Powhatan Sewer Project

SOL #: 12445226Q0007Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA EAST 12
Atlanta, GA, 303092449, United States

Place of Performance

Asheville, NC

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Construction Of Sewage And Waste Facilities (Y1ND)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 22, 2026
2
Last Updated
Mar 6, 2026
3
Submission Deadline
Mar 2, 2026, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service is soliciting quotations for the Lake Powhatan Sewer Project in Asheville, NC. This Total Small Business Set-Aside opportunity involves the decommissioning and removal of an existing 20,000-gpd wastewater treatment plant and auxiliary systems, along with components of a sewer pump station, and connecting to the municipal sewer system. The project magnitude is estimated between $1,000,000 and $5,000,000. Quotations are due March 2, 2026, at 5:00 P.M. ET.

Scope of Work

The project requires the complete decommissioning and removal of an onsite 20,000-gpd wastewater treatment plant and its auxiliary systems. This also includes the removal of various components from the sewer pump station, such as pumps, rails, and the control panel. The contractor will be responsible for connecting the site to the existing municipal sewer system. All decommissioned and demolished materials must be taken possession of and removed entirely from the site. Detailed plans, specifications, and a bid schedule are provided in Attachments 2, 3, and 4, respectively.

Contract Details

  • Opportunity Type: Combined Synopsis/Solicitation (RFQ)
  • Anticipated Contract Type: Firm-Fixed-Price
  • Magnitude: Between $1,000,000 and $5,000,000
  • Set-Aside: Total Small Business Set-Aside (NAICS 237110, Size Standard $45 million)
  • Bonds: Performance and Payment Bonds, each 100% of the original contract award price, are required within 5 days of award. Irrevocable letter of credit or SF-25A/SF-25 forms are allowed.
  • Place of Performance: Asheville, NC

Submission & Evaluation

Award will be made to the offeror with the highest technically rated quotation that also presents fair and reasonable pricing and acceptable or neutral past performance; tradeoffs will not be conducted.

  • Technical Approach: Submit a sound, compliant approach, including details on three relevant construction projects (valued at $250,000+, water/wastewater utility work, completed within 7 years) and a brief narrative.
  • Price: Quotations will be evaluated for fair and reasonable pricing. Bidders must use the Bid Schedule (Attachment 4) for pricing. The Davis-Bacon Wage Determination (Attachment 5) must be used for labor cost calculations.
  • Past Performance: Provide information for three relevant construction projects via questionnaire, CPARS, or CCASS report. The Past Performance Questionnaire (PPQ) template (Attachment 7) should be completed by clients and submitted directly to the government by the due date.

Key Dates & Contact

  • Questions Due: February 13, 2026, 12:00 PM ET
  • Site Visit (Highly Encouraged): February 4, 2026, at 10:00 AM ET (refer to Attachment 6 for details)
  • Quotations Due: March 2, 2026, 5:00 P.M. ET
  • PPQ Submissions Due: March 2, 2026, 5:00 PM EST
  • Contact: SIMS, JALISA C (jalisa.sims@usda.gov)

People

Points of Contact

SIMS, JALISA CPRIMARY

Files

Files

No files attached to this opportunity

Versions

Version 7
Combined Synopsis/Solicitation
Posted: Mar 6, 2026
View
Version 6
Combined Synopsis/Solicitation
Posted: Mar 4, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: Mar 3, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Feb 27, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Feb 27, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Feb 26, 2026
View
Version 1Viewing
Combined Synopsis/Solicitation
Posted: Jan 22, 2026
Lake Powhatan Sewer Project | GovScope