Lake Powhatan Sewer Project

SOL #: 12445226Q0007Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA EAST 12
Atlanta, GA, 303092449, United States

Place of Performance

Asheville, NC

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Construction Of Sewage And Waste Facilities (Y1ND)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 22, 2026
2
Last Updated
Mar 6, 2026
3
Submission Deadline
Mar 9, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service is soliciting quotations for the Lake Powhatan Sewer Project in Asheville, NC. This Total Small Business Set-Aside opportunity involves the decommissioning and removal of a wastewater treatment plant and associated sewer infrastructure, followed by connection to the municipal sewer system. Quotations are due March 9, 2026, at 5:00 PM EST.

Scope of Work

This project requires the complete decommissioning and removal of an onsite 20,000-gpd wastewater treatment plant (WWTP) and its auxiliary systems. The contractor will also remove various components of the existing sewer pump station, including pumps, rails, and the control panel. The final phase involves connecting the system to the existing municipal sewer. The contractor will be responsible for taking possession of all decommissioned and demolished materials and removing them entirely from the site. Detailed construction plans and specifications are provided in Attachments 2 and 3.

Contract Details

This is anticipated to be a Firm-Fixed-Price contract with a magnitude estimated between $1,000,000 and $5,000,000. The period of performance is 270 calendar days from the notice to proceed.

  • Set-Aside: Total Small Business Set-Aside (NAICS 237110, size standard $45 million).
  • Bid Guarantee: Required at 30% of the bid price or $3,000,000.00, whichever is less.
  • Performance & Payment Bonds: Both are required at 100% of the original contract award price, due 5 days after award. Acceptable forms include Irrevocable Letter of Credit, Payment Bond Form SF-25A, and Performance Bond Form SF-25. The Bid Bond form is SF24.

Submission & Evaluation

Offerors must submit quotations in five volumes: Acknowledgement of Amendments, Bid Guarantee, Technical Approach, Past Performance, and Price. SF30s and acknowledged amendments should be included in Volume 1.

  • Technical Approach: Requires a narrative and submission of three relevant construction projects (valued at $250,000+, completed within 7 years, involving water/wastewater utility work).
  • Past Performance: Evaluated based on questionnaires (Attachment 7), CPARS, or CCASS reports. Clients should submit PPQs directly to the government.
  • Evaluation: Award will be made to the offeror with the highest technically rated quotation, fair and reasonable pricing, and acceptable or neutral past performance. Tradeoffs will not be conducted. Offerors must hold prices firm for 90 calendar days.

Key Dates & Attachments

  • Quote Due Date: March 9, 2026, at 5:00 PM EST.
  • Published Date: March 4, 2026 (latest update).
  • Contact: Jalisa C. Sims (jalisa.sims@usda.gov). Key attachments include revised solicitation terms, construction plans, technical specifications, bid schedule, Davis-Bacon Wage Determination, and a Past Performance Questionnaire template. Questions and Answers have been posted via Amendment 1.

People

Points of Contact

SIMS, JALISA CPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 7
Combined Synopsis/Solicitation
Posted: Mar 6, 2026
View
Version 6Viewing
Combined Synopsis/Solicitation
Posted: Mar 4, 2026
Version 5
Combined Synopsis/Solicitation
Posted: Mar 3, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Feb 27, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Feb 27, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Feb 26, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Jan 22, 2026
View
Lake Powhatan Sewer Project | GovScope