N041--CON-NRM-663A4-23-201 Replace 40 Ton Condenser BLDG 200

SOL #: 36C26026R0035Solicitation

Overview

Buyer

Veterans Affairs
Veterans Affairs, Department Of
260-NETWORK CONTRACT OFFICE 20 (36C260)
VANCOUVER, WA, 98661, United States

Place of Performance

Tacoma, WA

NAICS

Plumbing (238220)

PSC

Installation Of Equipment: Refrigeration, Air Conditioning, And Air Circulating Equipment (N041)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)

Timeline

1
Posted
Dec 16, 2025
2
Last Updated
Apr 23, 2026
3
Submission Deadline
Apr 27, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Veterans Affairs (VA), specifically Network Contracting Office 20, is soliciting proposals for a Firm-Fixed-Price Construction Contract to replace a 40-ton condenser at Building 200 of the Puget Sound HCS American Lake VA Medical Center in Lakewood, WA. This opportunity is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside. Proposals are due by April 27, 2026, at 10:00 am PDT.

Scope of Work

The project, identified as Project 663A4-23-201, involves the demolition, removal, and new construction for the replacement of a rooftop-mounted 40-ton refrigerant condenser and its associated infrastructure. This includes condensate piping, refrigerant line-sets, refrigerant evaporators, and the exterior walk-in freezer. The contractor must provide all labor, materials, and equipment, ensuring new materials are installed per manufacturer's instructions. Disposal of construction debris and hazardous waste must comply with VA policies. Work may occur during normal campus operational hours, after hours, or on weekends. Compliance with VA safety, Infection Control Risk Assessment (ICRA), and Pre-Construction Risk Assessment (PCRA) protocols is mandatory. The VA will provide a temporary mobile freezer, but the contractor is responsible for providing a generator and any necessary access ramps/stairs.

Contract Details

  • Solicitation Number: 36C26026R0035
  • Contract Type: Firm-Fixed-Price Construction Contract
  • NAICS Code: 238220 (Plumbing, Heating, and Air Conditioning Contractors)
  • Size Standard: $19 Million
  • Magnitude: Expected to be between $1,000,000 and $5,000,000
  • Period of Performance: 249 calendar days from the Notice to Proceed
  • Place of Performance: Building 200, American Lake Campus, Lakewood, WA
  • Warranty: One-year parts and labor warranty from the date of acceptance.

Submission & Evaluation

  • Proposals Due: April 27, 2026, at 10:00 am PDT
  • Set-Aside: 100% Service-Disabled Veteran-Owned Small Business (SDVOSB). Proposals from non-SDVOSB concerns will not be considered.
  • Evaluation Factors: Proposals will be evaluated based on Key Personnel and Capacity, Technical Approach, Past Performance, and Price. Technical factors (1 & 2) are more important than Past Performance (3). Factors 1-3 combined are significantly more important than Price (4).
  • Requirements: A bid guarantee is required. Performance and Payment Bonds, along with insurance coverage documentation, are required within ten (10) calendar days of Notice of Award.
  • Key Personnel: Clarifications have removed the requirement for elevator construction/installation licensing and Certified Elevator Technicians as key personnel. Subcontractor personnel can meet key personnel qualifications.
  • Cost Breakout: Bidders must use the updated "Attachment 9 - Division Cost Breakout Version 2."
  • Past Performance: For Mentor-Protégé Joint Ventures, the Protégé's applicable past performance will be evaluated with the Mentor's; if not, only the Mentor's will be evaluated.

Important Notes

Multiple amendments have been issued, providing clarifications on key personnel requirements, the division cost breakout, and temporary cooler specifications. Site visits were conducted on March 3, 2026, and April 13, 2026. Bidders must adhere to the Contractor Rules of Behavior for VA systems, comply with subcontracting limitations (85% for general construction), and utilize the specified prevailing wage rates for Pierce County, WA. All questions have been addressed in a Q&A document. Contact Kaycee D Benson, Contract Specialist, at kaycee.benson@va.gov for further inquiries.

People

Points of Contact

Kaycee D Benson, ContractorContract SpecialistPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 10Viewing
Solicitation
Posted: Apr 23, 2026
Version 9
Solicitation
Posted: Apr 22, 2026
View
Version 8
Solicitation
Posted: Apr 20, 2026
View
Version 7
Solicitation
Posted: Apr 7, 2026
View
Version 6
Solicitation
Posted: Mar 25, 2026
View
Version 5
Solicitation
Posted: Mar 10, 2026
View
Version 4
Solicitation
Posted: Mar 4, 2026
View
Version 3
Solicitation
Posted: Feb 24, 2026
View
Version 2
Pre-Solicitation
Posted: Feb 24, 2026
View
Version 1
Pre-Solicitation
Posted: Dec 16, 2025
View
N041--CON-NRM-663A4-23-201 Replace 40 Ton Condenser BLDG 200 | GovScope