Runway Rubber Removal and Stripping
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Air Force (FA4897 366 CONS PKP) is soliciting proposals for Runway Rubber Removal and Airfield Markings Maintenance at Mountain Home Air Force Base, ID. This is a 100% Women-Owned Small Business (WOSB) Set-Aside opportunity, with an estimated magnitude between $1,000,000 and $5,000,000. The project involves extensive rubber removal from runways, restriping, and crack repair on airfield pavements. Proposals are due by May 27, 2026, at 4:00 PM local time.
Scope of Work
The primary scope includes:
- Rubber Removal: Removing approximately 420,000 square feet of rubber from runways 30 and 12.
- Airfield Markings: Striping new instrument control and wing tip clearance lines (yellow and black). This also includes removing and replacing markings on taxiways, parking aprons, and flightline roads, and repainting taxiway edge and centerline markings on LOLA C.
- Crack Repair: Sealing and repairing cracks in asphalt shoulders adjacent to Taxiway Alpha "A" and the Alpha Arm/Dearm Pad, addressing cracks from 1/4" to 4" wide according to UFGS 32-01-17.61.
Optional line items cover additional edge markings, crack cleaning and sealing on LOLA C, and removal/restriping of apron edge lines and tow-only lines. Detailed visual guidance for marking modifications, including relocation of apron edge markings, modification of towway lines, and addition of wingtip clearance and INST Hold Lines, is provided in attachments.
Contract Details
- Contract Type: Firm Fixed Price.
- Period of Performance: Work must commence within 10 calendar days of award and be completed within 90 calendar days after the Notice to Proceed.
- Estimated Magnitude: Between $1,000,000 and $5,000,000.
- Set-Aside: 100% Women-Owned Small Business (WOSB) Program Set-Aside.
- NAICS Code: 237310 (Road, Street, and Bridge Construction) with a size standard of $45,000,000 annual receipts.
Submission & Evaluation
- Proposal Due Date: May 27, 2026, at 4:00 PM local time.
- Proposal Validity: Offers must be valid for at least 110 calendar days.
- Evaluation Factors: Price and Past Performance.
- Requirements: Performance and Payment Bonds are mandatory. Electronic submission of payment requests and receiving reports via Wide Area WorkFlow (WAWF) is required.
Special Requirements & Site Visit
Work requires coordination with the Airfield Manager, adherence to UFC 3-260-04 standards, and specific procedures for night operations and Foreign Object Damage (FOD) prevention. Personnel require airfield access approval (EAL). A site visit is scheduled for May 20, 2026, at 0900 at Building 261, Mountain Home Air Force Base.