WA NP MORA 11(1), Fryingpan Creek Bridge

SOL #: 69056726B000001Pre-Solicitation

Overview

Buyer

Transportation
Federal Highway Administration
690567 WESTERN FEDERAL LANDS DIV
VANCOUVER, WA, 98661, United States

Place of Performance

WA

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

No set aside specified

Timeline

1
Posted
Sep 19, 2025
2
Last Updated
Feb 23, 2026

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Federal Highway Administration (FHWA), under the Department of Transportation, has issued a presolicitation for the WA NP MORA 11(1), Fryingpan Creek Bridge replacement project. Located in Mount Rainier National Park, Washington, this project involves replacing the existing bridge, realigning the roadway, and associated infrastructure improvements. The estimated price range is $10 million to $20 million. The solicitation is tentatively expected in Spring 2026 (April/May), with project completion by Summer 2029.

Scope of Work

This project entails the construction of a new single-span, 218.5-foot long steel plate girder bridge with a cast-in-place concrete deck. Abutments will be founded on deep foundations (drilled shafts). Upon completion of the new structure, the existing steel arch girder bridge will be demolished. Additional work includes 0.27 miles of roadway realignment, parking lot construction, minor pipe culvert replacement, and stone masonry. The stone masonry work involves removing, salvaging, constructing, and pointing, with new masonry designed to match the character of existing historic masonry. Detailed plans also cover drainage, erosion and sediment control, temporary stream diversions, traffic control, reinforcing steel schedules, MSE walls, site grading, and mitigation efforts such as log deflectors and root wads.

Contract & Timeline

  • Contract Type: Presolicitation (for a construction contract)
  • Estimated Price Range: $10 million to $20 million
  • Project Length: 0.27 miles
  • Tentative Fixed Completion Date: Summer 2029
  • Tentative Solicitation Date: Spring 2026 (April/May)
  • Published Date: February 23, 2026 (latest update)

Set-Aside

This solicitation is offered as Full and Open.

Additional Notes

Prospective bidders are strongly encouraged to review the detailed engineering plans and drawings (mora11-1_Plans_Pre-Ad.pdf) to understand the full scope, material requirements, and construction methodologies. To receive notifications when the solicitation documents are posted, interested parties should click the "follow" button on the SAM.gov opportunity page. Technical questions can be directed to wfl.plans-spec@dot.gov, and general inquiries to Contracts G. Office at wfl.contracts@dot.gov or 360-619-7520. No show-me tours will be available, but bidders are encouraged to view the project site during the fall, as winter conditions may impede access.

People

Points of Contact

Contracts G. OfficePRIMARY

Files

Files

Download
Download
Download
Download

Versions

Version 2Viewing
Pre-Solicitation
Posted: Feb 23, 2026
Version 1
Pre-Solicitation
Posted: Sep 19, 2025
View
WA NP MORA 11(1), Fryingpan Creek Bridge | GovScope