WA NP MORA 11(1), Fryingpan Creek Bridge

SOL #: 69056726B000001Solicitation

Overview

Buyer

Transportation
Federal Highway Administration
690567 WESTERN FEDERAL LANDS DIV
VANCOUVER, WA, 98661, United States

Place of Performance

WA

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

No set aside specified

Timeline

1
Posted
Sep 19, 2025
2
Last Updated
Jun 12, 2026
3
Submission Deadline
Jul 1, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Federal Highway Administration (FHWA), Western Federal Lands Division, is soliciting bids for the WA NP MORA 11(1), Fryingpan Creek Bridge Replacement Project within Mount Rainier National Park, Pierce County, WA. This project involves the construction of a new bridge, roadway realignment, and associated infrastructure. The estimated value is $15,000,000 to $25,000,000. Bids are due by July 1, 2026.

Scope of Work

This project entails the replacement of the Fryingpan Creek Bridge with a new single-span, 218.5-foot long steel plate girder bridge featuring a cast-in-place concrete deck, founded on deep drilled shafts. Key deliverables include:

  • Demolition of the existing steel arch girder bridge.
  • Roadway realignment and parking lot construction.
  • Minor pipe culvert replacement and stone masonry work, matching historic character.
  • Various earthwork, aggregate, asphalt, and concrete paving elements.
  • Slope reinforcement, retaining walls, and incidental construction (culverts, inlets, curbing, sidewalks).
  • Traffic control measures, facilities, and mitigation efforts such as log deflectors and root wads. Work is to be performed under two separate bid schedules (A and B), requiring compliance with FP-14 Standard Specifications.

Contract & Timeline

  • Contract Type: Firm Fixed-Price with Economic Price Adjustment.
  • Estimated Value: $15,000,000 to $25,000,000.
  • Period of Performance: Commencement within 10 calendar days after Notice to Proceed (anticipated August 25, 2026), with completion not later than September 28, 2029, for both schedules.
  • Set-Aside: None specified. Large businesses are required to submit an acceptable subcontracting plan prior to contract award.
  • Bid Due Date: July 1, 2026, at 21:00:00Z.

Submission & Evaluation

Bids must be submitted as a printed copy; electronic bids are not accepted. A bid bond is required, along with a completed "Authority to Sign" document and Representations & Certifications. The evaluation includes a 10% price factor applied to an apparent low bid from a large business if a HUBZone small business also submits a bid.

Important Notes

Prospective bidders are encouraged to view the project site, though Federal Highway Administration personnel will not be available for show-me tours. Numerous Questions & Answers documents and three amendments (A001, A002, A003) have been issued, providing clarifications and modifying bid schedules, special contract requirements, physical data, and plan sheets. Bidders must review all amendments and Q&A documents, especially Amendment A002 which extended the bid due date. General questions can be directed to wfl.contracts@dot.gov or 360-619-7520, and technical questions to wfl.plans-spec@dot.gov.

People

Points of Contact

Contracts G. OfficePRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 13
Solicitation
Posted: Jun 12, 2026
View
Version 12
Solicitation
Posted: Jun 12, 2026
View
Version 11Viewing
Solicitation
Posted: Jun 11, 2026
Version 10
Solicitation
Posted: Jun 9, 2026
View
Version 9
Solicitation
Posted: Jun 8, 2026
View
Version 8
Solicitation
Posted: Jun 3, 2026
View
Version 7
Solicitation
Posted: Jun 1, 2026
View
Version 6
Solicitation
Posted: May 29, 2026
View
Version 5
Solicitation
Posted: May 27, 2026
View
Version 4
Solicitation
Posted: May 26, 2026
View
Version 3
Solicitation
Posted: May 12, 2026
View
Version 2
Pre-Solicitation
Posted: Feb 23, 2026
View
Version 1
Pre-Solicitation
Posted: Sep 19, 2025
View
WA NP MORA 11(1), Fryingpan Creek Bridge | GovScope