WA NP MORA 11(1), Fryingpan Creek Bridge
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Federal Highway Administration (FHWA), Western Federal Lands Division, is planning a Full and Open presolicitation for the WA NP MORA 11(1), Fryingpan Creek Bridge project. This project involves the replacement of the Fryingpan Creek Bridge at Mount Rainier National Park, WA, with an estimated value between $10 million and $20 million. The tentative solicitation date is Winter 2026, with a tentative completion date of Summer 2029.
Scope of Work
The project encompasses the replacement of the Fryingpan Creek Bridge, located along Sunrise Park Road within Mount Rainier National Park. Key components include:
- Construction of a single span, 218.5-foot long steel plate girder bridge with a cast-in-place concrete deck.
- Abutments founded on deep foundations (drilled shafts).
- Demolition of the existing steel arch girder bridge upon completion of the new structure.
- Roadway realignment, parking lot improvements, and minor pipe culvert replacement.
- Stone masonry work, including removal, salvage, construction, and pointing, with new masonry matching historic character.
- Various earthwork, aggregate, asphalt, and concrete paving elements.
- Slope reinforcement and retaining walls.
- Incidental construction such as culverts, inlets, curbing, sidewalks, and masonry.
- Implementation of traffic control measures, including permanent and temporary markings, barricades, drums, flaggers, and signage.
- Provision of facilities and services, including a field office and bicycle storage racks.
- Mitigation efforts like log deflectors and root wads.
Contract & Timeline
- Contract Type: Presolicitation (Invitation for Bids expected)
- Estimated Price Range: $10 million to $20 million
- Project Length: 0.27 miles
- Set-Aside: Full and Open
- Tentative Solicitation Date: Winter 2026
- Tentative Fixed Completion Date: Summer 2029
- Published Date: September 19, 2025
Evaluation
Specific evaluation criteria are not yet specified, as this is a presolicitation. Refer to the future SF-1442 continuation, Block 11, for exact dates and details once the solicitation is issued.
Additional Notes
Prospective bidders are encouraged to view the project site during the fall, as viewing conditions may be difficult due to snow and seasonal road closures (October-May). No Federal Highway Administration personnel will be available for show-me tours. To receive notifications when the solicitation documents are posted, interested parties should click the “follow” button on the SAM.gov opportunity page. Technical questions can be submitted via email to wfl.plans-spec@dot.gov, and general questions to wfl.contracts@dot.gov or by phone at 360-619-7520.