WA NP MORA 11(1), Fryingpan Creek Bridge
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Federal Highway Administration (FHWA), Western Federal Lands Division, on behalf of the Department of Transportation, is soliciting bids for the WA NP MORA 11(1), Fryingpan Creek Bridge Replacement Project within Mount Rainier National Park, Washington. This project involves the construction of a new bridge, roadway realignment, and associated infrastructure improvements. The estimated value is between $15 million and $25 million. Bids are due by July 1, 2026, at 1400 local time.
Scope of Work
This project entails the replacement and realignment of the Fryingpan Creek Bridge. Key deliverables include:
- Construction of a single span, 218.5-foot long steel plate girder bridge with a cast-in-place concrete deck, founded on deep foundations (drilled shafts).
- Demolition of the existing steel arch girder bridge upon completion of the new structure.
- Roadway realignment, parking lot construction, and minor pipe culvert replacement.
- Stone masonry work, including salvaging and constructing new masonry to match historic character.
- Various earthwork, aggregate, asphalt, and concrete paving elements.
- Slope reinforcement, retaining walls, and incidental construction (culverts, inlets, curbing, sidewalks).
- Traffic control measures, log deflectors, and root wads.
- Work is to be performed under two separate bid schedules, A and B, and bidders must complete both. Compliance with Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14, is required.
Contract Details
- Contract Type: Firm Fixed-Price with Economic Price Adjustment.
- Solicitation Number: 69056726B000001.
- Estimated Price Range: $15,000,000 to $25,000,000.
- Period of Performance: Work must commence within 10 calendar days after the Notice to Proceed (anticipated August 25, 2026) and be completed no later than September 28, 2029, for both schedules.
- Set-Aside: This is an open competition. A low bidder who is a LARGE business is required to submit an acceptable subcontracting plan prior to contract award. This requirement does not apply to small businesses. A 10% price evaluation factor will be applied to an apparent low bid from a large business if a HUBZone small business also bids.
Submission & Evaluation
- Bids Due: July 1, 2026, at 1400 local time.
- Submission Method: Printed copy of bid is required; electronic, facsimile, or email bids are not authorized.
- Requirements: Proposal submission requires a completed "Authority to Sign" document and Representations & Certifications. A bid bond is also required.
- Evaluation: Price evaluation factor as noted above for HUBZone small businesses.
Additional Notes
Prospective bidders are encouraged to view the project site, though no Federal Highway Administration personnel will be available for show-me tours. General and technical questions regarding proposed work will be accepted until 5 business days from the due date. Road closures are limited to 6 hours per calendar day during daytime only, with no night work or consecutive closures permitted. Amendment A002 extended the bid opening date and revised the Notice to Proceed date.