WA NP MORA 11(1), Fryingpan Creek Bridge
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Federal Highway Administration, Western Federal Lands Div is soliciting bids for the WA NP MORA 11(1), Fryingpan Creek Bridge Replacement Project within Mount Rainier National Park, Washington. This project involves the construction of a new bridge, demolition of the existing structure, and associated infrastructure improvements. The estimated value is $15,000,000 to $25,000,000. Bids are due July 1, 2026.
Scope of Work
This project entails the replacement and realignment of the Fryingpan Creek Bridge. Key deliverables include:
- Construction of a single span, 218.5-foot long steel plate girder bridge with a cast-in-place concrete deck, founded on deep foundations (drilled shafts).
- Demolition of the existing steel arch girder bridge.
- Roadway realignment and parking lot improvements.
- Minor pipe culvert replacement and stone masonry work, including matching historic masonry.
- Various earthwork, aggregate, asphalt, and concrete paving elements.
- Slope reinforcement, retaining walls, and incidental construction.
- Traffic control measures and the addition of a log jam structure. Work is to be performed under two separate bid schedules, A and B, with bidders required to complete both.
Contract Details
- Contract Type: Firm Fixed-Price with Economic Price Adjustment.
- Estimated Price Range: $15,000,000 to $25,000,000.
- Period of Performance: Commencement within 10 calendar days after Notice to Proceed (anticipated August 25, 2026), with completion not later than September 28, 2029 for both schedules.
- Set-Aside: This is an open competition. Large businesses are required to submit an acceptable subcontracting plan prior to contract award; this requirement does not apply to small businesses.
Submission & Evaluation
- Bids Due: July 1, 2026, at 1400 local time.
- Submission Method: Printed bids only; electronic, facsimile, or email bids will not be accepted.
- Required Documents: Completed "Authority to Sign" document, Representations & Certifications, and a bid bond.
- Evaluation Factor: A 10% price evaluation factor will be applied to an apparent low bid from a large business if a HUBZone small business also submits a bid.
Important Notes
Prospective bidders are encouraged to view the project site, though Federal Highway Administration personnel will not be available for show-me tours. General and technical questions will be accepted until 5 business days from the due date. Road closures are limited to 6 hours per calendar day during daytime only, with no night work or consecutive closures permitted. Several amendments (A001, A002, A003) have been issued, updating wage schedules, bid dates, notice to proceed dates, bid schedules, special contract requirements, and plan sheets. Bidders must acknowledge all amendments with their offer.