WA NP MORA 11(1), Fryingpan Creek Bridge
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Federal Highway Administration (FHWA), under the Department of Transportation, has issued a presolicitation for the WA NP MORA 11(1), Fryingpan Creek Bridge replacement project. Located in Mount Rainier National Park, Washington, this project involves replacing the existing bridge, realigning the roadway, and associated infrastructure improvements. The estimated price range is $10 million to $20 million. The solicitation is tentatively expected in Spring 2026 (April/May), with project completion by Summer 2029.
Scope of Work
This project entails the construction of a new single-span, 218.5-foot long steel plate girder bridge with a cast-in-place concrete deck. Abutments will be founded on deep foundations (drilled shafts). Upon completion of the new structure, the existing steel arch girder bridge will be demolished. Additional work includes 0.27 miles of roadway realignment, parking lot construction, minor pipe culvert replacement, and stone masonry. The stone masonry work involves removing, salvaging, constructing, and pointing, with new masonry designed to match the character of existing historic masonry. Detailed plans also cover drainage, erosion and sediment control, temporary stream diversions, traffic control, reinforcing steel schedules, MSE walls, site grading, and mitigation efforts such as log deflectors and root wads.
Contract & Timeline
- Contract Type: Presolicitation (for a construction contract)
- Estimated Price Range: $10 million to $20 million
- Project Length: 0.27 miles
- Tentative Fixed Completion Date: Summer 2029
- Tentative Solicitation Date: Spring 2026 (April/May)
- Published Date: February 23, 2026 (latest update)
Set-Aside
This solicitation is offered as Full and Open.
Additional Notes
Prospective bidders are strongly encouraged to review the detailed engineering plans and drawings (mora11-1_Plans_Pre-Ad.pdf) to understand the full scope, material requirements, and construction methodologies. To receive notifications when the solicitation documents are posted, interested parties should click the "follow" button on the SAM.gov opportunity page. Technical questions can be directed to wfl.plans-spec@dot.gov, and general inquiries to Contracts G. Office at wfl.contracts@dot.gov or 360-619-7520. No show-me tours will be available, but bidders are encouraged to view the project site during the fall, as winter conditions may impede access.