WA NP MORA 11(1), Fryingpan Creek Bridge

SOL #: 69056726B000001Solicitation

Overview

Buyer

Transportation
Federal Highway Administration
690567 WESTERN FEDERAL LANDS DIV
VANCOUVER, WA, 98661, United States

Place of Performance

WA

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

No set aside specified

Timeline

1
Posted
Sep 19, 2025
2
Last Updated
Jun 12, 2026
3
Submission Deadline
Jul 1, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Federal Highway Administration, Western Federal Lands Div (Department of Transportation) is soliciting bids for the WA NP MORA 11(1), Fryingpan Creek Bridge Replacement Project within Mount Rainier National Park, Pierce County, WA. This project involves the construction of a new bridge, demolition of the existing structure, and associated infrastructure improvements. The contract is a Firm Fixed-Price with Economic Price Adjustment with an estimated value between $15,000,000 and $25,000,000. Bids are due by July 1, 2026, at 1400 local time.

Scope of Work

This project entails the replacement of the Fryingpan Creek Bridge with a new 218.5-foot single-span steel plate girder bridge featuring a cast-in-place concrete deck founded on deep drilled shafts. Key deliverables include:

  • Demolition of the existing steel arch girder bridge.
  • Roadway realignment and parking lot construction/improvements.
  • Minor pipe culvert replacement and stone masonry work, matching existing historic character.
  • Various earthwork, aggregate, asphalt, and concrete paving elements.
  • Slope reinforcement, retaining walls, and incidental construction (culverts, inlets, curbing, sidewalks).
  • Traffic control measures and facilities/services, including a field office.
  • Mitigation efforts such as log deflectors and root wads. The work is to be performed under two separate bid schedules (A and B), both requiring completion.

Contract Details

  • Contract Type: Firm Fixed-Price with Economic Price Adjustment.
  • Estimated Value: $15,000,000 to $25,000,000.
  • Period of Performance: Commencement within 10 calendar days after a Notice to Proceed (anticipated August 25, 2026), with completion not later than September 28, 2029.
  • Set-Aside: This is an open competition. A low bidder who is a LARGE business is required to submit an acceptable subcontracting plan prior to contract award. This requirement does not apply to small businesses. A 10% price evaluation factor will be applied to an apparent low bid from a large business if a HUBZone small business also bids.
  • Product Service Code: Y1LB (Construction Of Highways, Roads, Streets, Bridges, And Railways).

Submission & Evaluation

  • Bids Due: July 1, 2026, at 1400 local time.
  • Submission Method: Printed copy of bid required. Electronic, facsimile, and email bids are not authorized.
  • Requirements: A bid bond is required. Proposal submission must include a completed "Authority to Sign" document and Representations & Certifications.
  • Evaluation: Award will be based on the low bid, with a price evaluation factor for HUBZone small businesses as noted above.

Key Clarifications & Amendments

Multiple Questions & Answers (Q&A) documents and three amendments (A001, A002, A003) have been issued. Bidders must acknowledge all amendments.

  • Amendment A002 extended the bid due date to July 1, 2026, and revised the Notice to Proceed date.
  • Amendment A003 replaced the entire Bid Schedule, updated Special Contract Requirements, replaced physical data files, and updated numerous plan sheets.
  • Construction Logistics: Road closures are limited to 6 hours per calendar day, daytime only, with no night work or consecutive closures. Construction sequence flexibility is limited and must adhere to permitted allowances.
  • Technical Details: Drilled shaft concrete diameter cannot be reduced below the permanent casing, and no separate pay item will be provided for difficult drilling conditions or rock obstructions. Hot-dipped galvanized steel mesh reinforcement is required for MSE walls; geosynthetics are not accepted.
  • Site Visits: Prospective bidders are encouraged to view the project site; however, no Federal Highway Administration personnel will be available for show-me tours.

Contact Information

People

Points of Contact

Contracts G. OfficePRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 13
Solicitation
Posted: Jun 12, 2026
View
Version 12Viewing
Solicitation
Posted: Jun 12, 2026
Version 11
Solicitation
Posted: Jun 11, 2026
View
Version 10
Solicitation
Posted: Jun 9, 2026
View
Version 9
Solicitation
Posted: Jun 8, 2026
View
Version 8
Solicitation
Posted: Jun 3, 2026
View
Version 7
Solicitation
Posted: Jun 1, 2026
View
Version 6
Solicitation
Posted: May 29, 2026
View
Version 5
Solicitation
Posted: May 27, 2026
View
Version 4
Solicitation
Posted: May 26, 2026
View
Version 3
Solicitation
Posted: May 12, 2026
View
Version 2
Pre-Solicitation
Posted: Feb 23, 2026
View
Version 1
Pre-Solicitation
Posted: Sep 19, 2025
View
WA NP MORA 11(1), Fryingpan Creek Bridge | GovScope