Request for Whitepapers: AEDC Velocity Alliance - A Multi-Billion Dollar OTA Consortium Opportunity
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Air Force (DAF), through the Air Force Test Center (AFTC) and Arnold Engineering Development Complex (AEDC), is seeking whitepapers for membership in the AEDC Velocity Alliance. This multi-billion dollar consortium, established under 10 U.S.C. § 4022, aims to accelerate the modernization of national test infrastructure for next-generation defense systems. Membership is required to compete for future projects. The first onboarding opportunity's whitepapers are due June 1, 2026.
Purpose & Scope
The AEDC Velocity Alliance is a strategic initiative to establish a pre-qualified industrial base for complex engineering and construction projects. The program focuses on sustaining, restoring, and modernizing critical test assets and supporting utilities at AEDC and potentially other AFTC installations. Projects will cover diverse categories including General and Industrial Construction, various Process Systems (low/high pressure, hazardous), Electrical (high/medium/low voltage), Fire Suppression, Equipment Repair, and Mechanical, Electrical, and ID&C Engineering Services.
Membership & Requirements
To join the Alliance, vendors must submit a whitepaper demonstrating capabilities and meeting mandatory criteria. Key requirements include:
- Joint Certification Program (JCP): Current certification.
- Cybersecurity Maturity Model Certification (CMMC): CMMC Level 2 certified, or a NIST SP 800-171 assessment with a CMMC Level 2 compliance roadmap showing full certification by November 2026.
- Innovation and Partnership Capability: Whitepapers must identify at least one partner that is a Non-Traditional Defense Contractor (NDC), a Small Business, or a Nonprofit Research Institution (e.g., university). This applies even if the prime is a small business.
Submission & Evaluation
Whitepapers must be submitted electronically as a single, searchable PDF, not exceeding ten pages (including any cover page). Evaluation is a four-part Pass/Fail process covering Mandatory Certifications, Technical Competency (based on past performance within the last five years), Intellectual Property Rights Acknowledgement, and Innovation and Partnership Capability. Successful vendors will be invited to a mandatory group site visit at Arnold Air Force Base, TN, followed by execution of a Membership Agreement. This is an unfunded solicitation for qualification; financial obligations begin only upon award of specific Project-Level Agreements.
Contract Details
- Type: Other Transaction Agreement (OTA) Consortium (for membership)
- Set-Aside: None specified for this RFWP, but partnership requirements emphasize NDCs/Small Businesses.
- Primary NAICS: 541330 - Engineering Services (for size standard; project-level NAICS may differ).
- Primary PSC: AC13 - National Defense R&D Services; Department of Defense - Military; Experimental Development.
- Anticipated Investment: Multi-billion dollar portfolio through FY32.
- Project Competition: Projects will be competed exclusively among Alliance members, generally on a Best Value basis with a preference for Firm-Fixed-Price (FFP) milestone-based structures.
Key Dates
- Onboarding Opportunity 1 Whitepapers Due: June 1, 2026, COB (Central Daylight Time)
- Mandatory Site Visit Window 1: June 1, 2026 – June 30, 2026
- Anticipated Consortium Live Date: July 1, 2026
- Onboarding Opportunity 2 Whitepapers Due: September 1, 2026, COB
- Mandatory Site Visit Window 2: September 1, 2026 – September 30, 2026
- Notice Active Until: September 30, 2032