Z1DA--648-24-701 EHRM Infrastructure Upgrades Phase 2 Construction - Portland, OR

SOL #: 36C77625B0050Pre-Solicitation

Overview

Buyer

Veterans Affairs
Veterans Affairs, Department Of
PCAC (36C776)
INDEPENDENCE, OH, 44131, United States

Place of Performance

Portland, OR

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Maintenance Of Hospitals And Infirmaries (Z1DA)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)

Timeline

1
Posted
Oct 9, 2025
2
Last Updated
Mar 11, 2026
3
Response Deadline
Feb 17, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Veterans Affairs (VA) sought bids for the EHRM Infrastructure Upgrades Phase 2 Construction project at the Portland VA Medical Center, OR, and Vancouver VA Medical Center, WA. This 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside opportunity involved comprehensive infrastructure upgrades to support the new Electronic Health Record Modernization (EHRM) system. Bids for this Firm-Fixed-Price contract, estimated between $5 million and $10 million, have been received and abstracted as of March 11, 2026.

Scope of Work

The project encompassed a wide range of construction and infrastructure improvements across both campuses. Key deliverables included:

  • Installation of redundant fiber runs and primary fiber home runs.
  • Upgrades to Telecommunication Rooms (TRs) and data drops.
  • Architectural demolition, reconfiguration, expansion, and renovation of existing spaces.
  • Structural alterations and new equipment support construction.
  • Electrical upgrades (panels, power distribution, UPS, lighting, outlets).
  • Installation and programming of Building Automation System (BAS) equipment and HVAC upgrades.
  • Plumbing modifications and new installations.
  • Data communication infrastructure upgrades, including re-cabling to CAT 6A and fiber backbone upgrades.
  • Civil site construction, landscaping, and roadway asphalt repair.
  • Abatement of asbestos and lead-based paint.
  • Fire Suppression, Fire Alarm, firestopping, and fire caulking upgrades.
  • Physical security upgrades (access control, intrusion detection, cameras).

Contract Details

  • Contract Type: Firm-Fixed-Price (FFP)
  • Period of Performance: Approximately 365 calendar days from Notice to Proceed.
  • Magnitude of Construction: Between $5,000,000 and $10,000,000.
  • Set-Aside: 100% Service-Disabled Veteran-Owned Small Business (SDVOSB). Offerors were required to be SBA certified.
  • NAICS Code: 236220 (Commercial and Institutional Building Construction) with a size standard of $45 million.

Key Requirements

Bidders were required to submit a Bid Guarantee (20% of bid price, not to exceed $3,000,000) and would be required to provide Performance and Payment Bonds upon award. Compliance with prevailing wage rates (Davis-Bacon Act) for Multnomah County, OR, and Clark/Skamania Counties, WA, was mandatory. The project also mandated adherence to VHA Infection Control Risk Assessment (ICRA) protocols and specific limitations on subcontracting (e.g., not paying more than 85% of general construction contract amount to non-SDVOSB/VOSB firms, excluding materials). Detailed project scheduling and reporting requirements were outlined, including the designation of a qualified 3rd-party scheduling consultant.

Submission & Evaluation

The solicitation was issued as an Invitation for Bid (IFB). Offers were evaluated based on the lowest price that was fair and reasonable and most advantageous to the Government, considering the Grand Total for Line Items 0001 (Vancouver) and 0002 (Portland). Technical questions were due by January 29, 2026. The final bid submission deadline was March 4, 2026, at 1:00 PM EST, with a bid opening on March 5, 2026, via teleconference.

Current Status

Bids for this opportunity have been received and an Abstract of Offers was posted on March 11, 2026, detailing the submitted bid prices from various offerors. This notice serves to inform about the bids received for the project.

People

Points of Contact

Sierra TateContract SpecialistPRIMARY
Bridget MaySECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
View

Versions

Version 15
Special Notice
Posted: Mar 11, 2026
View
Version 14
Special Notice
Posted: Mar 11, 2026
View
Version 13
Solicitation
Posted: Feb 26, 2026
View
Version 12
Solicitation
Posted: Feb 26, 2026
View
Version 11
Solicitation
Posted: Feb 24, 2026
View
Version 10
Solicitation
Posted: Feb 18, 2026
View
Version 9
Solicitation
Posted: Feb 17, 2026
View
Version 8
Solicitation
Posted: Feb 6, 2026
View
Version 7
Solicitation
Posted: Feb 3, 2026
View
Version 6
Solicitation
Posted: Jan 23, 2026
View
Version 5
Solicitation
Posted: Jan 20, 2026
View
Version 4
Solicitation
Posted: Jan 20, 2026
View
Version 3
Pre-Solicitation
Posted: Jan 20, 2026
View
Version 2Viewing
Pre-Solicitation
Posted: Jan 14, 2026
Version 1
Pre-Solicitation
Posted: Oct 9, 2025
View