Z1DA--648-24-701 EHRM Infrastructure Upgrades Phase 2 Construction - Portland, OR

SOL #: 36C77625B0050Solicitation

Overview

Buyer

Veterans Affairs
Veterans Affairs, Department Of
PCAC (36C776)
INDEPENDENCE, OH, 44131, United States

Place of Performance

Portland, OR

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Maintenance Of Hospitals And Infirmaries (Z1DA)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)

Timeline

1
Posted
Oct 9, 2025
2
Last Updated
Mar 11, 2026
3
Submission Deadline
Feb 17, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Veterans Affairs (VA) has issued a solicitation for the EHRM Infrastructure Upgrades Phase 2 Construction project at the Portland VA Health Care System and the Vancouver VA Medical Center. This project involves critical infrastructure improvements to support the Electronic Health Record Modernization (EHRM) system. This is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside. Bids are due by February 17, 2026, at 1:00 PM EST.

Scope of Work

The contractor will provide all labor, materials, and supervision for comprehensive infrastructure upgrades across both campuses. Key tasks include:

  • Telecommunications: Installing redundant fiber runs, adding primary fiber home runs, and upgrading/relocating Telecommunication Rooms (TRs) with CAT 6A cabling.
  • Electrical & HVAC: Upgrading power distribution, UPS systems, lighting, and HVAC controls, including Building Automation System (BAS) integration.
  • Architectural & Structural: Demolition, reconfiguration of existing spaces, new flooring, doors, and structural supports for equipment.
  • Safety & Security: Hazardous material abatement (asbestos and lead), fire suppression/alarm upgrades, and physical security enhancements (cameras, access control).
  • Civil: Site construction and landscaping related to infrastructure paths.

Contract & Timeline

  • Contract Type: Firm-Fixed-Price (Invitation for Bid - IFB)
  • Magnitude of Construction: Between $5,000,000 and $10,000,000
  • Period of Performance: 365 calendar days from the Notice to Proceed
  • Set-Aside: Total SDVOSB (SBA certification required at time of bid)
  • Response Due: February 17, 2026, 1:00 PM EST

Evaluation

Award will be made to the responsible bidder whose bid is the lowest price that is fair, reasonable, and most advantageous to the Government. Bidders must submit a lump sum price for both the Vancouver (Line Item 0001) and Portland (Line Item 0002) campuses.

Additional Notes

Recent amendments (0001-0003) have clarified site visit instructions, provided attendance sheets from the January 27, 2026 site visit, and adjusted the submission deadline time to 1:00 PM EST. A 20% Bid Guarantee is required with the submission.

People

Points of Contact

Sierra Y TateContract SpecialistPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
View

Versions

Version 15
Special Notice
Posted: Mar 11, 2026
View
Version 14
Special Notice
Posted: Mar 11, 2026
View
Version 13
Solicitation
Posted: Feb 26, 2026
View
Version 12
Solicitation
Posted: Feb 26, 2026
View
Version 11
Solicitation
Posted: Feb 24, 2026
View
Version 10
Solicitation
Posted: Feb 18, 2026
View
Version 9
Solicitation
Posted: Feb 17, 2026
View
Version 8
Solicitation
Posted: Feb 6, 2026
View
Version 7Viewing
Solicitation
Posted: Feb 3, 2026
Version 6
Solicitation
Posted: Jan 23, 2026
View
Version 5
Solicitation
Posted: Jan 20, 2026
View
Version 4
Solicitation
Posted: Jan 20, 2026
View
Version 3
Pre-Solicitation
Posted: Jan 20, 2026
View
Version 2
Pre-Solicitation
Posted: Jan 14, 2026
View
Version 1
Pre-Solicitation
Posted: Oct 9, 2025
View
Z1DA--EHRM Infrastructure Upgrades Phase 2 Construction - Portland, OR | GovScope