Z1DA--648-24-701 EHRM Infrastructure Upgrades Phase 2 Construction - Portland, OR
SOL #: 36C77625B0050Solicitation
Overview
Buyer
Veterans Affairs
Veterans Affairs, Department Of
PCAC (36C776)
INDEPENDENCE, OH, 44131, United States
Place of Performance
Portland, OR
NAICS
Commercial and Institutional Building Construction (236220)
PSC
Maintenance Of Hospitals And Infirmaries (Z1DA)
Set Aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)
Original Source
Timeline
1
Posted
Oct 9, 2025
2
Last Updated
Mar 11, 2026
3
Submission Deadline
Mar 5, 2026, 6:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of Veterans Affairs (VA) is soliciting bids for the EHRM Infrastructure Upgrades Phase 2 Construction project at the Portland VA Medical Center, OR, and Vancouver VA Medical Center, WA. This Firm-Fixed-Price Invitation for Bid (IFB) is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside. Bids are due on March 5, 2026, at 1:00 PM EST.
Scope of Work
This project involves comprehensive infrastructure upgrades to support the new Electronic Health Record Modernization (EHRM) system. Key tasks include:
- Fiber Optic & Data Infrastructure: Installation of redundant fiber runs, primary fiber home runs, new data drops, and re-cabling existing data to CAT 6A.
- Facility Upgrades: Architectural demolition, reconfiguration, renovation, and construction of new finished spaces.
- Electrical & HVAC: Upgrades to electrical panels, power distribution, UPS, lighting, and HVAC systems, including Building Automation System (BAS) installation.
- Site Work: Civil site construction, landscaping, and underground conduit runs (requiring full excavation, no horizontal boring).
- Safety & Security: Abatement of asbestos and lead-based paint, fire suppression/alarm upgrades, firestopping by certified contractors, and physical security enhancements.
- Locations: Work will be performed at both the Portland VA Medical Center (3710 SW US Veterans Hospital Rd, Portland, OR) and Vancouver VA Medical Center (1601 E Fourth Plain BLVD, Vancouver, WA).
Contract Details
- Contract Type: Firm-Fixed-Price (FFP)
- Magnitude of Construction: Estimated between $5,000,000 and $10,000,000.
- Period of Performance: Approximately 365 calendar days from Notice to Proceed.
- NAICS Code: 236220 (Commercial and Institutional Building Construction) with a $45 million size standard.
- Set-Aside: 100% Service-Disabled Veteran-Owned Small Business (SDVOSB). Offerors must be SBA certified.
Submission & Evaluation
- Bid Submission: Bids must be submitted via email to Sierra.Tate@va.gov and Bridget.May@va.gov by March 5, 2026, at 1:00 PM EST. The bid opening will be conducted via teleconference.
- Evaluation: Award will be made to the responsible bidder offering the lowest price that is fair and reasonable, based on the Grand Total for Line Items 0001 (Vancouver) and 0002 (Portland).
- Bid Guarantee: Required, 20% of bid price, not to exceed $3,000,000.
- Bonds: Performance and Payment Bonds will be required upon award.
Key Requirements & Notes
- Subcontracting Limitations: General Construction contracts require that not more than 85% of the contract amount (excluding materials) be paid to firms not certified as SDVOSBs.
- Prevailing Wages: Bidders must comply with Davis-Bacon Act prevailing wage rates for Multnomah County, OR, and Clark/Skamania Counties, WA.
- Infection Control: Adherence to VHA Infection Control Risk Assessment (ICRA) requirements is mandatory.
- Project Scheduling: A qualified 3rd-party scheduling consultant is required, utilizing Oracle Primavera P6 or Microsoft Project Professional.
- Personnel Badging: All personnel working within VA facilities require a VA PIV Card; the process must be initiated immediately after bonds are provided.
- Sales Tax: All state and local sales or use taxes for construction materials must be included in the bid price.
- Site Work Hours: Cable and fiber terminations behind closed doors during normal business hours; other work between 4:00 p.m. and midnight (or four 10-hour shifts).
- Site Supervision: A separate Site Superintendent is required for each campus if both are under simultaneous construction.
- Technical Questions: Responses to technical questions have been provided in Amendment 0006 and the attached Technical Question Tracker.
People
Points of Contact
Sierra Y TateContract SpecialistPRIMARY
Files
Versions
Version 15
Special Notice
Posted: Mar 11, 2026
Version 14
Special Notice
Posted: Mar 11, 2026
Version 13
Solicitation
Posted: Feb 26, 2026
Version 12Viewing
Solicitation
Posted: Feb 26, 2026
Version 11
Solicitation
Posted: Feb 24, 2026
Version 10
Solicitation
Posted: Feb 18, 2026
Version 9
Solicitation
Posted: Feb 17, 2026
Version 8
Solicitation
Posted: Feb 6, 2026
Version 7
Solicitation
Posted: Feb 3, 2026
Version 6
Solicitation
Posted: Jan 23, 2026
Version 5
Solicitation
Posted: Jan 20, 2026
Version 4
Solicitation
Posted: Jan 20, 2026
Version 3
Pre-Solicitation
Posted: Jan 20, 2026
Version 2
Pre-Solicitation
Posted: Jan 14, 2026
Version 1
Pre-Solicitation
Posted: Oct 9, 2025